The Signature

September 24th, 2013 Leave a comment

The Signature, a 27-storey residential development by Excel Focus Properties in Perai, Penang. This development is strategically located along Jalan Baru within mere minutes drive from Penang bridge. It comprises 148 condominium units with indicative price from RM362,000 onwards.

Property Project : The Signature
Location : Jalan Baru, Perai, Penang
Property Type : Apartment/Condominium
Tenure : Freehold
Total Units: 148
Indicative Price: RM362,000 onwards
Project Website: http://www.thesignature.my
Developer : Excel Focus Properties Sdn. Bhd.
Marketing Agent: Reapfield
Contact No.: +604-288 1888

 

Show Unit (with ID) – Contributed by developer (06/12/2013)

 

Show Unit (standard) – Contributed by developer (06/12/2013)

 

Site Progress – Contributed by developer (06/12/2013)



Categories: Prai Tags:
  1. Joan
    February 10th, 2014 at 16:17 | #1

    Yes,left wing with ms yusniza, so far no call received

  2. ck
    February 10th, 2014 at 16:21 | #2

    hi Joan, so curious..I just call Ms Yuniza she said almost all from left wing except who got loan from hong leong( or CIMB) no need to resign..she said during cny while made call no one answer phone..may be you can call her to confirm about it? I also wanna know what happen about them…

  3. signer
    February 12th, 2014 at 09:37 | #3

    i get the call from bank that developer start to collect money from bank

  4. Vincent12
    February 12th, 2014 at 09:58 | #4

    @ck
    Yes Left wing, but not no.1-3. So there is no require for me to re-sign?

  5. Vincent12
    February 12th, 2014 at 09:59 | #5

    @Joan

    Hi Joan, what is the facebook address. Cant find it.

  6. joan
    February 12th, 2014 at 14:00 | #6

    still calling, cannot reach lawyer firm

  7. Joan
    February 12th, 2014 at 14:17 | #7

    Just called Ms Yusniza, no issue for me.. Those who need to sign is the one using the old Load Agreement format..
    Btw, i had replyed on the facebook link.. somehow been moderated

  8. ck
    February 12th, 2014 at 14:21 | #8

    hi vincent12, oh ya is (floor no. – 1,2,3) (facing penang bridge and afternoon sun) I not sure may know can you call Ms yusniza to clarify it? she told me many of buyers need to re-sign .

  9. ck
    February 12th, 2014 at 14:26 | #9

    Joan :
    Just called Ms Yusniza, no issue for me.. Those who need to sign is the one using the old Load Agreement format..
    Btw, i had replyed on the facebook link.. somehow been moderated

    I see Joan, ya she just just for who used the old format, may know when u sign the loan agreement? I sign end of Dec still use the old format..x_x. may know what is your fb link

  10. Joan
    February 12th, 2014 at 14:31 | #10

    i signed on early of December, cant exactly remember the date, but for sure earlier then u..
    About the link, i had repost, but still cannot gone thru

  11. ck
    February 12th, 2014 at 14:45 | #11

    Joan :
    i signed on early of December, cant exactly remember the date, but for sure earlier then u..
    About the link, i had repost, but still cannot gone thru

    may know what is your Bank?

  12. Joan
    February 12th, 2014 at 14:48 | #12

    AMMB :)

  13. Joan
    February 12th, 2014 at 14:48 | #13

    Ambank, do i know what shud i do to avoid these pending moderation ?

  14. ck
    February 12th, 2014 at 15:19 | #14

    I see, may be your bank ald using new form..not sure. sorry not understand your meaning pending moderation?

  15. Chocolate
    February 12th, 2014 at 15:29 | #15

    Not only this project buyers need to re-sign he form, I heard others project also the same, to fulfill BNM guideline.

    Joan, just tell us what is the FB name?

  16. Joan
    February 12th, 2014 at 15:46 | #16

    facebook dot com slash groups slash signature.owner
    Not sure can or not

  17. Joan
    February 12th, 2014 at 15:47 | #17

    try to change dot and slash.. u should be able to see the group… i not sure, why link cannot be pasted :(

  18. salim
    February 15th, 2014 at 22:26 | #18

    the nice offer

    good price

    limited unit

    only view park view

    free hold.good developer .industrial area and good for investment.

  19. salim
    February 15th, 2014 at 22:47 | #19

    yes the developer already consider everything before built@InvD76

  20. salim
    February 15th, 2014 at 22:52 | #20

    yesterday, i went to sunway carnivall sbg jaya i met the property agent the promo the signature and the salesperson so kind and explain everthing.

    my opinion , the developer wont take a risk, he will study the market and face the challange and make the right choice of project. he spent million to build without look for buyer.

    this mean he make the right strategies in bussiness other can go out.

    we thing once, the developer will thing 100 times before built.

    thank you.

  21. VincentongGE
    February 16th, 2014 at 11:52 | #21

    What is the selling price now? I am interest with the high floor, any offer?

  22. lee1966
    February 16th, 2014 at 15:02 | #22

    Went to show room yesterday. Made the booking today. Overall I liked it. Might not be others’ cup of tea. Reasons:
    1. I rented a room along Jalan Baru for few months, when I started working in Penang 20+ years ago. So many changes happened in that time period along that Jalan Baru. Kind of a sentimental value to me, to finally planted the root where I started of in Penang.
    2. Quality of work is above average as I compared to others that I saw within the price range around Mainland condos and the block area about 1200 sft.
    3. Semi/fully furnished. Thus avoid to send few thousands for the basic thing for extra renovation when moving in.

  23. joan
    February 16th, 2014 at 17:46 | #23

    Anyone went to site ? Feel excited to see the latest progress… FYI, loan already started execute, received progress payment letter.
    P/S still waiting ppl to join the fb group :)

  24. KC
    February 16th, 2014 at 23:07 | #24

    @VincentongGE
    My name is KC, I am outsource banker who representing Maybank & OCBC.
    Please email me for more detail info kclor@hotmail.com
    Thanks

  25. Searching
    February 17th, 2014 at 01:25 | #25

    Units still available after so long time ?

  26. ck
    February 17th, 2014 at 12:05 | #26

    @joan
    hi Joan, may know when u received progress payment letter..
    I not yet submit my new loan agreement form, will cause any delay for the bank pay to developer..?

  27. joan
    February 17th, 2014 at 12:09 | #27

    forget the exact date, but letter date 17th Jan :)

  28. Tony
    February 18th, 2014 at 13:11 | #28

    Good location. Nice place to stay.

  29. Vincent12
    February 19th, 2014 at 10:24 | #29

    so far I don’t receive any document that require re-sign. I also received progress payment letter. Not sure have you guys notice the completion date whether has stated in the SNP document?

  30. Penangkia
    February 19th, 2014 at 10:29 | #30

    Are you sure the show room is open for visit for now?

    lee1966 :
    Went to show room yesterday. Made the booking today. Overall I liked it. Might not be others’ cup of tea. Reasons:
    1. I rented a room along Jalan Baru for few months, when I started working in Penang 20+ years ago. So many changes happened in that time period along that Jalan Baru. Kind of a sentimental value to me, to finally planted the root where I started of in Penang.
    2. Quality of work is above average as I compared to others that I saw within the price range around Mainland condos and the block area about 1200 sft.
    3. Semi/fully furnished. Thus avoid to send few thousands for the basic thing for extra renovation when moving in.

  31. Tony
    February 19th, 2014 at 13:02 | #31

    Left few units on lower floor.

  32. Chocolate
    February 19th, 2014 at 13:20 | #32

    Where is the sales office????

  33. Tony
    February 19th, 2014 at 13:35 | #33

    U have to contact reapfield, penang

  34. Tony
    February 19th, 2014 at 23:28 | #34

    @TS
    Is your unit still available?

  35. lee1966
    February 20th, 2014 at 17:19 | #35

    @Penangkia
    Penangkia – I presume the developer might entertain for showroom visit if there is anymore unit available for sale. You might want to contact Reapfield rep (the developer agent). The last I heard from the Reapfield agent after the roadshow at Sunway last weekend, is only a/few unit/s available, if I am not mistaken on the 2nd floor. Hope the information helpful. Good luck.

  36. Ram
    February 21st, 2014 at 20:20 | #36

    What’s the FB address?

  37. Mr Izz
    Mr Izz
    February 23rd, 2014 at 19:07 | #37

    Hi there,
    Looking for corner unit avai for me, moving up north asap. Any suggestion also appreciated.

    Pls msg me at geejoos@yahoo.com

    Rgds.

  38. signature 1202
    February 24th, 2014 at 16:41 | #38

    Hi Signature buyer,

    just booked my unit yesterday Level 6 corner unit.

    One of the best project in mainland with good offer.

    The sales person also said u will get TV , DVD and microvawe oven huhuhu…not buy bcoz of that …i just like the location very near to bridge…summore 2link open will reduce jam in here….

  39. Cicak
    February 24th, 2014 at 16:46 | #39

    @signature 1202

    Don’t waste your time and money lah. Go buy Batu Kawan, fresh air, less noise pollution. This one ah, aiyoh, surely get lung cancer after staying there for 5 years. Some more high voltage cable. Sorry, correction, cancer acquisition period shortened to 3 years….:)

  40. winwin
    winwin
    February 25th, 2014 at 09:09 | #40

    @signature 1202
    Did sales person told you that you will get TV, DVD and microwave ? it was not in the list provided. Is this additional/complimentary ?

  41. lee1966
    February 25th, 2014 at 17:28 | #41

    winwin.
    That was what mentioned to me by the agent too, either RM6K cash option or those “gift” TV, DVD and microwave, if I recall those gift lists correctly. I have yet to confirm that. Pending loan approval before signing the S&P. Maybe by then, I can verify that during S&P, if that stated officially in the S&P package if any.

  42. bhloy
    February 25th, 2014 at 18:27 | #42

    there seems to be a God in this column!

  43. ck
    February 26th, 2014 at 20:21 | #43

    signature 12 and lee 1966..may know your unit bought 2014 right, still under DIBS? May be the 6K or TV/DCD are some incentives replace DIBS? we bought last year sure not included the items you mentioned..they said no more DIBS year 2014..

  44. lee1966
    February 26th, 2014 at 21:05 | #44

    ck.
    I am not sure, how to verify that. Is it with developer or the bank ? I did some reading after I made the booking, and I still not clear how to differentiate whether developer bear the interest during construction, because it is still progress payment during construction by bank to developer. How to know, the monthly payment, certain % is principal and certain % goes to loan interest.

  45. lee
    February 26th, 2014 at 21:52 | #45

    Any available unit? How is the price now.

  46. ck
    February 26th, 2014 at 22:24 | #46

    @lee1966
    Your agent didn’t confirm with you? I think can ask your lawyer office

  47. Tony
    March 1st, 2014 at 22:47 | #47

    Told by reapfield, price will increase next week on the balance units.

  48. Michelle S
    March 4th, 2014 at 09:51 | #48

    Anyone can contribute picture of the signature construction progress?

  49. joan
    March 6th, 2014 at 10:21 | #49

    received 2nd progress payment letter (Phase 2b) :)

  50. Khoo
    March 7th, 2014 at 11:27 | #50

    Anyone loan with Maybank? They already started to purchase the fire insurance. Should the fire insurance needed during the construction period??? I’m wondering…

  51. Tony
    March 11th, 2014 at 16:25 | #51

    @Michelle S
    Level 24 .

  52. tbt
    tbt
    March 16th, 2014 at 21:22 | #52

    Any standard units still available? What i s the current price?

  53. evonne
    March 25th, 2014 at 15:07 | #53

    Any unit above level 10 still available?

  54. winwin
    winwin
    March 25th, 2014 at 23:28 | #54

    I talked to the developer today and was told only less than 5 units left, if not mistaken only at lower floor. you may call to Reapfield office . Somemore those buy in 2014 get 6k cash back to cover for DIBS. But seems that by Dec’14 the condo is to be completed with all agreed appliances. 6k cash rebate is better than DIBS .

  55. jinny
    March 26th, 2014 at 15:50 | #55

    Heard price already increase by 10k from early march. Is it true?

  56. john
    March 27th, 2014 at 08:02 | #56

    Any unit left at floor 26th, type b? Am interested. .

  57. wanmohdrafiq
    March 28th, 2014 at 10:27 | #57

    john :Any unit left at floor 26th, type b? Am interested. .

    Call Reapfield.

  58. wanmohdrafiq
    March 28th, 2014 at 10:30 | #58

    Khoo :Anyone loan with Maybank? They already started to purchase the fire insurance. Should the fire insurance needed during the construction period??? I’m wondering…

    Yes. As the risk of assets catch up by fire still already there. They have to secure their assets as well.

  59. alext
    March 30th, 2014 at 11:05 | #59

    Who know where nearly by station and going to where ,

  60. Searching
    March 30th, 2014 at 11:26 | #60

    wanmohdrafiq :

    Khoo :Anyone loan with Maybank? They already started to purchase the fire insurance. Should the fire insurance needed during the construction period??? I’m wondering…

    Yes. As the risk of assets catch up by fire still already there. They have to secure their assets as well.

    By right, during constructon phase, developer should be the one insure their asset. After all, their asset at this stage are still concrete, woods, bricks, metals. I m wondering also. Have other banks started the fire insurance also ?

  61. john
    April 5th, 2014 at 00:59 | #61

    What is the project status now? Up to which floor now?

  62. Michelle
    April 7th, 2014 at 10:03 | #62

    What is the expected completion date for this project. During the roadshow fair, they mentioned completion by December-2014. Is this true?

  63. winwin
    winwin
    April 8th, 2014 at 08:35 | #63

    @Michelle

    Recently Developer also mentioned that, expected completion by Oct’14 and key handover by Dec’14.
    Heard from Reapfield, only 5 units lower floor left and developer not giving discount anymore.

  64. Chocolate
    April 8th, 2014 at 08:47 | #64

    winwin :
    @Michelle
    Recently Developer also mentioned that, expected completion by Oct’14 and key handover by Dec’14.
    Heard from Reapfield, only 5 units lower floor left and developer not giving discount anymore.

    So what is the selling price without discount?

  65. winwin
    winwin
    April 8th, 2014 at 12:41 | #65

    @Chocolate
    you have to call Reapfield agent, because each level price differently. If not mistaken show unit is still available. should be about RM590++, if not mistaken

  66. Chocolate
    April 8th, 2014 at 13:26 | #66

    winwin :
    @Chocolate
    you have to call Reapfield agent, because each level price differently. If not mistaken show unit is still available. should be about RM590++, if not mistaken

    The cheapest one how much as u remember? I called them but they asked to go to their office only they give me the price. = =

  67. winwin
    winwin
    April 9th, 2014 at 08:34 | #67

    @Chocolate
    If I am not mistaken, cheapest without discount is RM434/=, lowest level, level 2.

  68. wanmohdrafiq
    April 9th, 2014 at 15:29 | #68

    Chocolate :

    winwin :@Chocolate you have to call Reapfield agent, because each level price differently. If not mistaken show unit is still available. should be about RM590++, if not mistaken

    The cheapest one how much as u remember? I called them but they asked to go to their office only they give me the price. = =

    Why inquiry so much? Interested? PM me. Want to let go my unit.

  69. Chocolate
    April 9th, 2014 at 18:26 | #69

    wanmohdrafiq :

    Chocolate :

    winwin :@Chocolate you have to call Reapfield agent, because each level price differently. If not mistaken show unit is still available. should be about RM590++, if not mistaken

    The cheapest one how much as u remember? I called them but they asked to go to their office only they give me the price. = =

    Why inquiry so much? Interested? PM me. Want to let go my unit.

    Can u leave me your email? Thanks.

  70. john
    April 10th, 2014 at 00:03 | #70

    Hi wan..u want to sell ur unit? What floor? How much

  71. Michelle
    April 10th, 2014 at 16:33 | #71

    winwin :
    @Michelle
    Recently Developer also mentioned that, expected completion by Oct’14 and key handover by Dec’14.
    Heard from Reapfield, only 5 units lower floor left and developer not giving discount anymore.

    So fast? Good to hear it!

  72. lee1966
    April 12th, 2014 at 14:28 | #72

    Passed by the site yesterday, construction progress up to 25th floor, 2 more floors to go. Looks like the Signature Avenue next door completed construction.

  73. john
    April 28th, 2014 at 14:25 | #73

    What is the status of the project now..anybody know?
    Up yo which floor now?

  74. john
    April 28th, 2014 at 14:44 | #74

    What is the status of the project now..anybody know?
    Up to which floor now?

  75. Chocolate
    April 28th, 2014 at 14:59 | #75

    They already start install the window etc to lower unit. Construction progress well, not to worry.

  76. JamesCST
    JamesCST
    April 28th, 2014 at 22:56 | #76

    @wanmohdrafiq
    im interested as well, can let me know more detail. im not sure how to use PM at here…@@

  77. JamesCST
    JamesCST
    April 28th, 2014 at 22:59 | #77

    Anyway, i called Reapfield this afternoon, they just told me all sale are on hold now untill further notice. If got also left 2nd 3rd and 5th floor remaining…:(

  78. ah kiao
    April 29th, 2014 at 18:25 | #78

    @JamesCST

    Lower flr has its pros too, I’m a 3rd flr buyer. i lived in 25th flr BJ Court and 12th flr Cassia Raja Uda before, no matter how fascinating the elevator is, I still not quite enjoy waiting for it. So, I no longer go for higher flr like I used to be when I was at the younger age.
    Below link is a good guide to refer.
    http://www.penang-traveltips.com/residential-properties.htm

  79. All bullshiter
    April 29th, 2014 at 23:11 | #79

    Fair :Honestly what i’ve compared between Prominence VS Signature.What i get:
    1) Prominence quite a lot units compared to signature. Signa is more privasi2) SQFT : Prominence is more spacious VS Signature ( 1276, 1507 VS 1087, 1195)3) Facilities (Promine > Signa)4) SkyBridge ( Promine:Floor 27th&28th Skylouge, Skyreading area, Karaoke, Skygym VSSign:Floor14th SkyGarden only): View Promi is better.5) SPA & LOAN ( Promi free all include stamping VS Sign need pay loan stamping)6) Syiling height ( Promi: 12M VS Sign 10.5M ( exclude plaster syiling) If Sign include p.syiling(I think around 11)7) Balcony (Promi around 4X10 @ 4.5X10, i measure myself) Sign i duno…but i’ve seen,smaller than Promi Car Park: (Promi: oly 1500sqft @ floor 20th above got 2car park. Sign: 2 car park) Sign isbetter9) Latest price ( Prom:1276 & 1507sqft left units around 450-5xxK above. Sign: 1195sqft>500K above but got provide all furniture ( Honestly designed by ur own not cost u toomuch, somemore u get ur own design)
    Above is oly for reference purpose and for discussion oly. Im not developer and agent. Im property seeker and compare to this two property only.
    Any discussion is well welcome.

    How about location? from what i observed is the prominence location is beeter due to when come to the round about u can easily choose the direction you wish to go, but for the signature, once you come to main road you only can go on direction, if you wish to go to BM side, then you may need to make U turn from very far away.
    Am i right? or there is another road can go to BM or juru side?

  80. Michelle
    May 2nd, 2014 at 14:36 | #80

    anyone can contribute and upload the progress picture here?

  81. lee1966
    May 3rd, 2014 at 18:07 | #81

    Michelle
    I have few photos taken on 12th April 2014. I can share, but dont know how to upload the pictures on this site.

  82. MsiaKini
    MsiaKini
    May 3rd, 2014 at 18:13 | #82

    lee1966 :
    Michelle
    I have few photos taken on 12th April 2014. I can share, but dont know how to upload the pictures on this site.

    Just email the photos to admin@penangpropertytalk.com and they will help you upload the photos. :-)

  83. joan
    May 10th, 2014 at 18:46 | #83

    @lee1966 u can post tis in our facebook page as well..

  84. GF
    May 11th, 2014 at 21:29 | #84

    @All bullshiter
    u can make a U turn not far away, around the BHP petrol station, this project different with Laguna, which have to make Un turn really far away.

  85. ah kiao
    May 19th, 2014 at 08:02 | #85

    Big banner “SOLD OUT phase 2 coming soon” is hanging on the building.

  86. Chocolate
    May 19th, 2014 at 08:19 | #86

    The signature phase 2??? The kampung beside the current site?

  87. chua
    May 19th, 2014 at 21:08 | #87

    phase 2? what does it mean? new project?

  88. ah kiao
    May 20th, 2014 at 09:44 | #88

    According to one of the Reapfield agent that I deal with, there will be a phase 2. I doubted it on that time coz no more free compound but all Kampung area. What he told me was this developer has purchased this land. Wait n see lor.

  89. Spiderman
    May 20th, 2014 at 13:28 | #89

    Phase 2 ? I want, I want, I want. Hopefully, bigger, cheaper, more luxury, less noisy.
    Where and when ?
    Eh, how come last Sep in this forum, a guy, Sam clarified so hard said there won’t be any phase 2, and must buy it now. Reapfield sales also said the same thing. Hmmmh. NVM liow.
    This time must camp at QBM already.

  90. hl
    May 21st, 2014 at 10:31 | #90

    yes, there is phase 2. was informed during launching. they actually plan to launch it last month

  91. ah kiao
    May 21st, 2014 at 10:32 | #91

    According to one of the Reapfield sales that I deal with, there will be a phase 2. I doubted it on that time coz no more free compound but all Kampung area. What he told me was this developer has purchased this land. Wait n see lor. But one thing for sure, phase 2 price will be higher.

  92. Chocolate
    May 21st, 2014 at 11:03 | #92

    hl :
    yes, there is phase 2. was informed during launching. they actually plan to launch it last month

    Where is the phase 2 location?

  93. ==
    May 21st, 2014 at 12:36 | #93

    last time first day I go QBM see their roadshow, after 8% rebate 360k for lowest floor, 380k for high floor, if buy 1 more car park+20k=400k, I ask them high floor gt sea view? they answer me cant promise to me due to gt future development, I think phase 2 will build inside, block the sea view, buy 400k condo for stay, ppl will think not worth better go for DST, if for invest, they build too fast will complete soon means u cant sell after oc or have to pay high RPGT, penalty from bank, if for long term, rental 2k only can cover installment, and u buy 400k now, can sell 500k later?

  94. ==
    May 21st, 2014 at 12:39 | #94

    but duno y still sell like hot cake, izzit I miss the boat? now phase 2 sure more expensive, but still many waiting for it.

  95. tommyguy
    May 22nd, 2014 at 16:14 | #95

    i was told phase is the vacant land across the river beside the phase 1 .. from front of the road i can only see 2nd hand car gallery.. hey wont reveal price for now.

  96. tommyguy
    May 22nd, 2014 at 16:14 | #96

    i was told phase 2 is the vacant land across the river beside the phase 1 .. from front of the road i can only see 2nd hand car gallery.. hey wont reveal price for now.

  97. Spiderman
    May 23rd, 2014 at 11:09 | #97

    @tommyguy

    If you know the indicative price, tell lah the price to share. U share with ppl info, ppl will share info also ma.

  98. Chocolate
    May 23rd, 2014 at 11:56 | #98

    Where u saw the banner Phase 2 coming soon?

    ah kiao :
    Big banner “SOLD OUT phase 2 coming soon” is hanging on the building.

  99. hl
    May 23rd, 2014 at 12:04 | #99

    @Chocolate
    hang on the signature bulding, its ab 10 floor’s length banner. regarding the phase 2 location, they said just nex to phase 1.

  100. tommyguy
    May 23rd, 2014 at 15:03 | #100

    @spiderman

    i also dont know the price, what i meant the agent wont reveal the price at the moment,.. maybe they want to see the initial response fist before setting the price.. so dont show them any interest first ..if phase 1 is selling rm450 psf , how much high they can sell for phase 2

  101. Chocolate
    May 23rd, 2014 at 15:20 | #101

    Ohh just saw the banner..I missed the banner before because it can not be seen from BM to Butterworth direction.

  102. ck2
    May 23rd, 2014 at 15:38 | #102

    last time when I visited show house and ask about the glass inside bathroom (actual unit is without glass door) and the renovated unit come with glass door, can see the picture about about the different. The project manager (I think) said will ask developer install the glass door in the bath room because he said also many people ask about this..now do not know the out come..hopefully the developer will install for all unit..

  103. Spiderman
    May 23rd, 2014 at 15:51 | #103

    @tommyguy

    OIC. Thks. Ok, ok, don’t show any interest first. Oh, oh, I think they read this forum also ma.

  104. Michelle
    June 2nd, 2014 at 13:13 | #104

    Construction is slowed down. What is happening?

  105. Concern buyer
    June 2nd, 2014 at 13:22 | #105

    Michelle :
    Construction is slowed down. What is happening?

    Really? The only reason why construction slowdown is due to cashflow problem. Didn’t pay the contractor on time.

  106. Joan
    June 5th, 2014 at 08:06 | #106

    Can we call the developer and asked the timeline whether meet at year end?

  107. buyer88
    June 5th, 2014 at 08:37 | #107

    Joan :
    Can we call the developer and asked the timeline whether meet at year end?

    sure, i am sure you can call the developer and ask.

  108. winwin
    winwin
    June 12th, 2014 at 10:43 | #108

    @buyer88

    according to developer, there is mo delay in expected completion timeline still by Dec’14. Currently completion stage is up to 2d for level 22- 25th. Phase II is in planning stage and for those interested can register with same agent Reapfield, agent for phase II.

  109. booka
    June 22nd, 2014 at 23:55 | #109

    Wonder how the facilities going to be. Like gym equipment. For example. .. its not written what equipment inside, no?

  110. JC
    June 30th, 2014 at 09:34 | #110

    Anyone had any ideal where was Phase 2 ?

  111. kris
    July 6th, 2014 at 13:41 | #111

    Phase 2 is behind the current one… surrounded by kampung houses..

  112. Michelle
    August 1st, 2014 at 14:31 | #112

    any update?

Comment pages
1 2 3 4 8669
  1. No trackbacks yet.
(You can also Login/Register to submit your comment using unique ID)

Comment Guidelines
  • Avoid political discussion.
  • Comments with inappropriate wordings or personal attack may be moderated or deleted.
  • Developer must register before comment. All anonymous comments claimed to be from developer without registration will be deleted.
  • Please do not advertise your property here. You may submit your property for sale/rent at PenangPropertySale.com.
  • All advertisement in the comment will be deleted. Please contact us for advertising details.



Property For Sale/Rent

FOR SALE/RENT

Sorry, there is no available unit for sale