fbpx

Triuni Residences

triuni-residences

Triuni Residences, the third phase of The Sanctuary development comprises three residential towers, with a total of 552 condominium units. It is strategically located within the established township of Batu Uban, next to The Sanctuary (Phase 1). Just a mere minutes drive from University Science Malaysia and Penang bridge.

  • Block 1: 22-storey (176 units) with 3-level multi-storey car park
  • Block 2: 24-storey (192 units) with 3-level multi-storey car park
  • Block 3: 23-storey (184 units) with 5-level multi-storey car park

Project Name : Triuni Residences
Location : Batu Uban, Penang
Property Type : Residential Development
Land Tenure: Freehold
Total Units : 552
Indicative Price: Gross from RM700psf onwards
Developer : B.U. Developments Sdn Bhd ( Runnymede Group)

Register your interest here for Tower B

*By submitting this Form, you hereby agree to our PDPA Consent Clause.
(These information will be forwared to the developer)

Location Map:

 

SITE PROGRESS

 

RELATED PROPERTIES FOR SALE/RENT AT
  1. StoneCold
    December 19th, 2017 at 09:48 | #1

    Puzzled :
    Anyone able to provide insight of the project? Interested to get one but worried by the comments about the construction delayed.

    Puzzled, no more delay there. All the construction work resumed 1, 2 weeks ago. They are working now every day inclusive of weekends (sat & sun). =)

  2. Puzzled
    December 19th, 2017 at 21:29 | #2

    @StoneCold
    Thanks. trying to drop by this weekend to see actual site as well. Location seems nice but Batu Uban under heavy construction too across the highway. If Triuni ends up surrounded by high rises would be a bummer.

  3. sss
    December 20th, 2017 at 09:55 | #3

    @Puzzled
    there is one more empty land beside vilaris. not sure that will build high rise or not in future. but i think that is all the empty land?at most 1 more high rise?

  4. Esgood
    December 29th, 2017 at 00:07 | #4

    The land next to Vilaris does not block directly (it’s to the side). The orientation is north-south so developments across the highway (east) will probably just block the side view (maybe you can’t see the bridge from the swimming pool like in the promo pic).

    Triuni is built on top of a small hill. The facilities floor is effectively around 8 stories from the highway level. If you can get a unit higher than 12th floor facing south most buildings should be below you.

    One more empty land is next to The Uban. Other than that I think most of the time unlikely to get blocked (the rest are all developed landed houses mostly).

  5. Puzzled
    December 29th, 2017 at 16:02 | #5

    @Esgood
    Thanks for helping out.
    It helps a lot in visualizing the right direction of unit selection. Facing south maybe the right choice. Went to the construction last weekend. Honestly, the pace is not that aggressive considering the scale of it.

  6. sss
    January 8th, 2018 at 10:27 | #6

    i also feel they r constructing abit slow…its 2018 already.

  7. StoneCold
    January 13th, 2018 at 13:27 | #7

    @sss
    I agreed with you. However, the staff at office speculated that the project can finish earlier by year end of 2019 actually. I have a bit doubt on it.

  8. Buyer
    January 16th, 2018 at 14:08 | #8

    @StoneCold
    Year end of 2019 is quite unlikely, as the SNP date is stamped on april 2017, and the said project stated needed 4 years for completion.

  9. Concern Buyer
    January 27th, 2018 at 23:00 | #9

    Have they started selling block B?

  10. sss
    February 8th, 2018 at 14:28 | #10

    just for update

    saw this on runnymede fb

    “we are happy to report that construction on the Triuni Residences site has been progressing well since commencement of construction on 1 December 2017. We are expecting to collect for Stage 2a very soon. Will keep everyone posted!”

  11. ghm1982
    April 13th, 2018 at 11:39 | #11

    Any Triuni buyer here? :)

  12. sss
    April 19th, 2018 at 14:37 | #12

    @ghm1982
    i am one of the buyer here..nice to meet u

  13. Buyer
    April 19th, 2018 at 22:29 | #13

    i’m one of the buyer here too..
    anyone know about the status of construction at site right now? and what is the expected completion date?
    seems like the progress at site a bit low pace..

  14. Esgood
    April 22nd, 2018 at 22:48 | #14

    @Buyer
    Construction pretty much in full swing. Crane is up. Car park for Block A start to build second floor.

  15. Buyer
    April 23rd, 2018 at 13:31 | #15

    @Esgood
    Thanks for the info. Just swing by the site in this morning and noticed the tower crane is in operation. Because is far in uphill thus difficult to see from outside.
    Very much hoping all the 3 Blocks can full swing at the same time, else meaningless to obtain earlier CCC for just Block A but the other two blocks still in construction, inconvenient with construction workers still moving around and truck lorry still accessing within Triuni’s compound may post damage to the completed infrastructures.
    Wondering the Block A unit 8 will be blocked by N-park.

  16. ghm1982
    April 23rd, 2018 at 13:37 | #16

    @sss, @Buyer

    Good to see all the buyer here. All of you buying for own stay?

    I dropped by their office and site on the last weekends, the Sales personnel had informed they will make collection for phase 2A soon. Although it’s a bit slow but it’s already progressing now. Crane is up and you can see from the highway there and a lot of workers working in the site now.

    What do you all think on the free kitchen cabinet with single hood and basin? Personally i feel not that practical as i buy for family stay. Did feedback to their Sales office and they promise will feedback to their management. Hope all owner can unite and do feedback since they did not really done the construction yet.

  17. Buyer
    April 23rd, 2018 at 22:44 | #17

    @ghm1982
    not soon..but in fact they have collected the stage 2A claim, i already started paying the interest…sad!
    The kitchen cabinet is FOC and will not cover even under the defect liability. It is not listed in the S&P and they also will let you to sign another stating you are aware about the kitchen cabinet is FOC and have no right to claim in future. Thus, i think is difficult for their management to change now. Else they will need to get all the buyer to re-sign the letter.
    Personally, i dont have much comment on the cabinet, just worry in future if were to extend the cabinet no sure the renovator can match the outlook or not.
    Single hood with two stoves my wife have no complaint about it since we foresee will not have major cooking all times, so we are fine with it. Just the basin, perhaps need to renovate to create another wet kitchen area replacing the 3rd toilet since we dont need it.

  18. zack
    June 18th, 2018 at 11:06 | #18

    Is Block B already open for sale? How’s the progress so far? From highway can’t really see the progress yet.

  19. Wong
    June 27th, 2018 at 17:33 | #19

    I am interested, what are the selling prices?

  20. sss
    July 12th, 2018 at 09:29 | #20

    @Wong
    u can contact their sales office at runnymede office.

  21. Buyer
    August 3rd, 2018 at 23:07 | #21

    Anyone can share how is the construction progress?
    View from LCE highway seems to be no vast progress since the construction started since end of last year.

  22. esgreat
    August 6th, 2018 at 23:09 | #22

    The workers are working everyday but I can’t see in detail. They seem to be working mainly on the base. The second large yellow crane was erected about two weeks ago.

  23. wlteo
    August 20th, 2018 at 11:30 | #23

    Interested for this projects, may i know the selling price ?

  24. Buyer
    August 20th, 2018 at 23:53 | #24

    @wlteo
    You may contact the sales office near the Triuni’s site at Batu Uban.
    The rough figure of selling price/ sqft is about RM680 with 4 types of unit size ranging from 1100++, 1300++, 1600++ and 1900++. But all this about Tower A. For Tower B and Tower C i heard already open for sell but im not sure about the selling price.

  25. alexo13
    August 23rd, 2018 at 00:45 | #25

    @wlteo

    700 psf listed in developer’s website. Smallest unit is 1130 sqft.

    We like the unit too, but it is around 200k over budget

  26. aeries
    August 28th, 2018 at 16:14 | #26

    Hi everyone,

    I’m one of the potential buyer with 1130 sqft. My parents love the design, the quality of materials which showed in showroom (hopefully materials to be provided is what exactly shown as per the showroom).

    My doubts for this project is as follow, appreciate anyone can provide some feedback:
    1) Understand that this project has stopped for quite some time and resumed work in 2018, is this implied the project is safe now?

    2) We understand from the salesperson that the project will be completed in 2021. But earlier post mentioned will be completed in 2019?

    3) The available unit for 1130 sqft now left with the view to JPJ, is this really a nice option? I would like to buy for own stay.

    4) I have a property in main land as 1st house (loan borrowed together with my sibling name), am I still entitle to borrow loan up to 90%?

    Thank you in advance for the potential feedback.

  27. ghm
    August 30th, 2018 at 09:21 | #27

    @aeries
    1) The construction is ongoing and they already have 2 cranes working on the site now. I would say it’s progressing.

    2) The first batch who sign the SNP should be on 2017 from what i understand from the Sales office. The project is 4 years time frame so estimated completion date is on 2021.

    3) You may check with the Sales office whether the Tower B & C already open to book. Tower A already left with limited choice.

    4) Yes, you still eligible for 90% loan for 2nd house.

  28. esgood
    September 7th, 2018 at 12:39 | #28

    Having seen some news about LTAT (Lembaga Tabung Angkatan Tentera) recently I recall learning from the developer that they are related.

    According to this article (http://www.runnymede.com.my/media/the-edge-malaysia-september-23-2013/) you can see that LTAT is listed as one of the founders.

    The whole area used to be a army camp so probably the land belonged to LTAT. I think Runneymede developed the current area after building a replacement camp near Sungai Ara.

    So in terms of funding that shouldn’t be a huge issue (I guess).

  29. esgood
    October 2nd, 2018 at 10:16 | #29

    Any update from the Tower B launch last weekend?

  30. ghm
    October 3rd, 2018 at 09:56 | #30

    @esgood
    They are not launching the Tower B. In fact, they are just open for early registration. As what i understand from the Sales personnel they have not decide the firm date of the launching yet and just gather the response. But they do having Sales event on that weekends for Tower A which the buyer can enjoy extra discount on the spinning wheel depends on their luck.

    By the way, anyone know will Triuni going to include the fiber broadband infra to support Time/Unifi?

  31. Buyer
    October 3rd, 2018 at 23:22 | #31

    @ghm
    hmm….then a bit worry on the gap of completion date between Tower A and the rest. Imagine if the developer able to handover the key to Tower A buyers on time, but the construction for Tower B&C are still on-going, how is the access for the truck and also daily with noisy sound, security and safety also another big concern.

    Looking at progress where Tower C have 5 level of basement carpark, over the year the contractor onboard, they are now still doing the base work now. Even for Tower A, over the past 7 months only construct 2 levels of carpark. Comparing with IJM 3 Residence at Sg Pinang, they are late start but now hitting up to Level 6 or 7 already.
    And yet they not yet launch Tower B & C, where to get fund to pay the Contractor if the Contractor really speed up the construction work? Chicken and egg thing, market response will determine the speed of delivery. As developer also hope to bill the purchaser at the soonest.

    For the internet, i recalled i do ask my sales person on this and if not mistaken will be TIME for Triuni. Will be another big surprise at this decade if no fiber infra made available for new development.

  32. ghm
    October 9th, 2018 at 13:07 | #32

    @Buyer
    Yes, this is the same concern i raised to them as well. Imagine that you already move in and the Tower B and Tower C still under construction. Will be very mess. The main structure will be ready together with Tower A but the inner part will not. They estimate at least need another year to fully complete. It is not fair to Tower A resident as need to bear with the noise, dusk, and safety concern if move in early. On top of that, we can’t enjoy the full facilities but start to pay for the full maintenance.

    Not really understand their Sales strategy and what hold them back for launching Tower B and C on the same piece of land. Foresee to have more issues when Tower A complete but B and C still ongoing.

    That would be great if ready with fiber infra since now the fiber broadband is much cheaper with the recent revise package by various ISP.

  33. sss
    October 16th, 2018 at 13:51 | #33

    i see 3 cranes now..but still not much construction going on…what is going on

  34. sss
    October 16th, 2018 at 13:53 | #34

    @ghm
    this problem i got mention to them too when we sign SNP
    if im not mistaken,they told us first year maintenance fee is waived due to not able to use full facility . but im more concerned is the dust and noises..if they stil constructing tower b/c ..haih

  35. Ryu
    October 16th, 2018 at 14:29 | #35

    I checked with the developer and understand that they will launch Tower B sometime in early February 2019. This project was initially soft launch sometime in November 2015 for Tower A and the very first sales package was 5% + 3%. Almost the same sales package as to-date.

    After I visited the showroom, the kitchen’s quality was not on-par with the pricing (min 700k) and tandem car park. At least use some quality kitchen supplier i.e. like signature kitchen or etc and many developers were using powder coated window / grille but not this.

    Based on visual observation, it still got 30% unsold units for Tower A despite for many years and I heard the launching price for tower B around 900k to 1.1m (crazy pricing for me). How about tower C??

    Good location but poor interior quality. Good luck to those purchasers.

  36. Melody
    October 18th, 2018 at 12:44 | #36

    @Ryu
    When I went to see the developer during their event in September, they said the launch of Tower B will be within the first half of 2019 and I also heard they may have an event during CNY 2019, so best to go and see what they have to offer for Tower A as well as Tower B then?

    What do you mean by poor interior quality? I saw the tiles, vanity top and timber flooring on their board in their Gallery, and I find them to be of really good quality. In fact, I have compared with other developers and I find this developer’s quality far better than most.

    I have also seen their workmanship in their Sanctuary bungalows (my uncle bought a bungalow from them) and see the workmanship is really good too. No issues with the house even after my uncle has been staying there for more than 10 years. I am now considering to buy 1 Triuni condo since their spin-the-wheel rebate is still available.

  37. mo
    October 19th, 2018 at 07:28 | #37

    @Ryu
    i find the showroom quality not bad….dont mind can share , which developer in penang offer better quality at this price range ?

  38. Buyer
    October 19th, 2018 at 15:54 | #38

    @Ryu
    i have no comment on the kitchen cabinet’s quality as it is FOC anyway. To me consider it as extra token given as i no need to spend another 10k to get the cabinet complete with hood and wave stove, yet no to say the mess to install the exhaust hood at external which need to hack the wall, the cost will not be cheap.

    Are you very sure that the window and grille are not powder coated? Then what is the material that they are using? Please share with us.
    As my brochure shows me is powder coated and it said so in my S&P…hmm if really not powder coated the developer consider breach the contract and we have the right to demand to change all windows according to contracted specs..

  39. Ryu
    October 19th, 2018 at 16:22 | #39

    @Melody and MO, you can refer to the IJM the light’s project and also E&O’s Tamarind. I believe the price range was about the same as Triuni Residence and the kitchen quality really disappointing and also the arrangement of car park for the smallest size. If you compare with Ideal, Ivory, Asia Green, of course Runneymede’s quality was on the high side.

    There is no doubt that the quality of the landed house built by them was impressive as you paying a higher price tag as well.

  40. sss
    October 22nd, 2018 at 11:35 | #40

    i agree the kitchen cabinet is..kind of low quality. but the others are quite good ,tiles and the timber flooring. btw i passed the site again…why is it still not much progress..

  41. Me
    January 17th, 2019 at 08:41 | #41

    Any owner WhatsApp group or Facebook group for the buyers/to-be-owners?

  42. Buyer
    January 17th, 2019 at 19:51 | #42

    @Me

    Any leader can take the initiative to create a group? I would like to join such group and receive updates.

  43. Kat
    January 25th, 2019 at 12:40 | #43

    North Will be block view by E Park, Sunnyville
    And east block by Zen

  44. sss
    January 28th, 2019 at 18:17 | #44

    i ok to create watapp group

    • CHAN
      August 25th, 2021 at 10:05 | #45

      Hi , new buyer here . could you please add me to the whatsapp group ? My email is chewlock69@gmail.com

      Thanks !

  45. Buyer
    January 29th, 2019 at 00:03 | #46

    @sss
    im in opinion that now is still not a matured period to create whatapps group/ facebook group as now nothing much can be shared or discussed among except the construction progress. Further, Tower B & C still yet to launch and we may have a very limited number of purchaser in the group. We still can utilize this platform to update the status if any.

    The good timing for all purchaser to unite and share info as well as discussion is just before the construction complete and we may have more topics to discuss about especially on the compliance and building defects.

    The group’s admin need to carefully validate the purchaser’s particulars to avoid spam/ fake purchaser instigate an issue that may create hard feeling among under one roof.

    what is other’s thought on this?

  46. buyer2
    February 14th, 2019 at 15:34 | #47

    Gong xi fa chai to all!
    Personally, i feel no harm in creating the group now. we can share info on the development progress and/or new towers’ marketing promo. i heard Tower B was opened during CNY sales …
    Other than whatapps group, another option is to create FB group …
    Agree on the point that all that is joining the group needs to show evidence that they are genuine buyers, also need to avoid owner list being sold to 3rd parties.

  47. ghm
    February 18th, 2019 at 14:41 | #48

    Tower B and C still not open for Sales yet when i drop by their fair in QB during CNY. As per what the Sales agent mentioned, they have not decide on the date yet. They just recently done their exhibition in HK to attract foreign buyer on Tower A and did saw a lot of Hongkee buyer pending for loan approval from their sales chart.

    The current promotion given was 5% + 2.8% discount with additional option to convert the units for Type A and B to dual key concept. They will separate out the master room from the unit and fully furnish on the master room after convert to dual key. Those who not opt for the dual key concept will entitle for 50K cash option upon CCC.

    Yup, agree with the creation of whatapps / FB group to share among the genuine buyer on the progress and news. Very limited info from the developer FB and progress sharing.

  48. mm
    March 11th, 2019 at 17:47 | #49

    Dear all buyers, am N-Park resident. It’s observed that the construction sites completely stopped with no workers working at all since few weeks ago. Pls check with the sales office to find out.

    As neighbor, I wish that the project will be completed soon. Otherwise, our view will be affected….

  49. Bernard
    March 14th, 2019 at 10:46 | #50

    Hi all, I think is good to have whatsapp group for all buyer to update each other on the progress of the project. I will join the group.

  50. ghm
    March 14th, 2019 at 15:31 | #51

    @mm
    Thanks for updating the progress on the project. It’s good to have someone keep an eyses on the site and provide with the update.
    I had made a call to the Sales office few days ago and was informed that there were some minor change on the plan like the road construction.
    They had stop the construction works and waiting for the city council approval. Today i pass by the express way and saw already have workers resume working at the site.

  51. Albert
    March 18th, 2019 at 14:17 | #52

    mm :
    Dear all buyers, am N-Park resident. It’s observed that the construction sites completely stopped with no workers working at all since few weeks ago. Pls check with the sales office to find out.
    As neighbor, I wish that the project will be completed soon. Otherwise, our view will be affected….

    Hi… have time to look out the window and tell us whether worker and crane functioning this week? :-)

  52. Mohammad idiam
    March 24th, 2019 at 15:14 | #53

    construction too slow, what happen to the developer? anyone know? also.beside N park will our condo value get impacted? Please advice expert.

  53. Buyer
    March 24th, 2019 at 22:43 | #54

    @ghm
    I am in the construction line. In my past 10 years of working life first heard that changes on the plan will lead to stop of construction. Usually the construction will go concurrently with the changes and part of changes wont lead to stop work. For instance, change in road work plan, why they need to stop the building works? As the construction is still on-going and not a handover product, the Authorities will have no idea whether the construction is go according to approved plan or the amendment plan until they call for Authority inspection. Thus, i am quite reserve on the statement putting up by the developer on the stop work for the past one month. If this is true, every construction will have to go awhile, stop awhile and go a while for plan approval as construction site will face site constraint everyday and changes are here and there until completion…
    From my experience, usually there are two major factors that lead to stop work, (1) payment/ cash flow issue, (2) stop work order by Authorities due to non-compliance in safety/ environmental issue.
    If you all aware, the site resume back the work about 2 weeks ago and i noticed they have put up the safety net and covered up the exposed soil slope surrounding before resume back the work, you all can make a guess now why they stop work.
    Now they are proceeding for tower erection and they are using aluminium system formwork. They have put up the system formwork for Level 1 since before CNY and until now they still at Level 1. The normal circle per floor construction by using system formwork is about 7~10 days. This can serve as a guide to gauge the speed of construction.

  54. Buyer
    March 24th, 2019 at 22:56 | #55

    @Mohammad idiam
    Agreed construction too too slow. The contract awarded to Kerjaya Prospek is 4 years counting from November 2017. And now they have not launch the Tower B & C but already start building it. This is not norm unless the cash flow from the Developer is very strong, and to certain extend even town reputable developer may not have that power to do that. This is chicken and egg thing. The faster the contractor build the work, the more the developer have to pay at upfront, who going to subsidize that if not from the purchaser? May end up with cash flow issue if financial not strong enough…

    Im not worry about the impact from N Park and is totally different range of market and at different entity. I am more concern what will be built to the last empty piece of land (also belong to Runnymede) at the junction entering to Sanctuary and also the sea view block from the Zen affordable homes opposite the highway.

  55. Mohammad idiam
    March 26th, 2019 at 13:49 | #56

    Thanks for the clarification, but it seem too expensive to hold, i have 1 unit and I’m confuse

  56. mm
    April 10th, 2019 at 09:45 | #57

    The construction resumes this few weeks.

  57. Albert
    April 11th, 2019 at 10:26 | #58

    @mm
    Good to know. Thanks much for keeping an eye.

  58. Lim
    May 10th, 2019 at 19:11 | #59
  59. fa
    May 13th, 2019 at 12:11 | #60

    Hi, is this a good / worth to buy? any advise
    feedback above stated delay & now they are having promotion for Tower A at Sales gallery…
    Appreciate advise

  60. Albert
    May 13th, 2019 at 20:58 | #61

    @fa
    What kind of promotion?
    Still on Tower A?

  61. Jennifer
    May 19th, 2019 at 12:42 | #62

    Looks like the seaview may be blocked by Zen Residence in future?

  62. TRIUNI
    May 20th, 2019 at 19:42 | #63

    @Albert

    Dear Albert,

    Yes We Only only Launch Tower A, U Can leave your contact here , We will sent u the Latest Package , Thanks alot ya :-)

  63. Albert
    May 22nd, 2019 at 19:32 | #64

    @TRIUNI

    What happen to the other 2 towers as advertised? Seems like these 2 towers launching relying on the success of Tower A sales. With Tower A still under promotion, is Tri-uni project soon becoming Mono-uni or Uni-uni? That’s something to worry about the entire project regardless whatever promotion since this project was launched in 2016/17?

  64. ryu
    May 23rd, 2019 at 21:54 | #65

    @aAlbert, not to mention three towers sharing the same facilities. As far as I concerned, they got hard time to sell those units with a starting price of about 700k c/w (front/back) car park for the smallest units.

  65. enquiry
    May 29th, 2019 at 10:35 | #66

    TRIUNI :
    @Albert
    Dear Albert,
    Yes We Only only Launch Tower A, U Can leave your contact here , We will sent u the Latest Package , Thanks alot ya

    can quote me?

  66. sss
    May 29th, 2019 at 10:39 | #67

    we have a group chat for buyers.hope more buyers can join.
    can email to here for request

    • LSE
      June 3rd, 2019 at 08:07 | #68

      I’m a buyer of a unit in Block A; requesting to join the WhatsApp group. Many thanks.

    • Tribuyer
      June 4th, 2019 at 06:59 | #69

      Hi, have been request through email but no reply.. :(

    • Tribuyer
      June 6th, 2019 at 20:10 | #70

      Halo.. Can add me to the wats app group? Been emailed but no response from admin..

    • Jennifer
      June 9th, 2019 at 10:21 | #71

      Please add me in the group chat, thanks.

      xue_hoon@yahoo.com

  67. ghm
    May 29th, 2019 at 10:47 | #72

    Calling all the buyer to join whatsapp group violating any house rules? Why admin keep on deleting our post regarding this.

  68. Buyer
    May 30th, 2019 at 22:16 | #73

    How to join the whatsapp group?

  69. jamesytl
    May 31st, 2019 at 19:05 | #74

    Any update on this project? Can invite me into the whatsapp group?

  70. Albert
    June 2nd, 2019 at 23:28 | #75

    @jamesytl
    Dropped by the site on my way back.
    Workers in and out of the site. Block A at 3rd floor now. Progress seems to be quite slow. I think Zen will over take it on completion.

  71. Tribuyer
    June 7th, 2019 at 08:35 | #76

    Hi,
    Can help to add me into the watsapp group? No response from admin after sending email request.

  72. Mervin
    June 10th, 2019 at 04:33 | #77

    Hi all,

    I am looking at Triuni as they are part of Home Ownership Campaign.

    The sales from Triuni confirmed on 7-Jun that only Tower A is open for purchase, Tower B and C are still pending for APDL approval.

    But whenever I passed by LCE highway, it can be clearly seen that they have already started the foundation and crane is ready for all towers. I really doubt if she was telling the truth. I am still considering if Triuni is a good and safe buy?!

    Let me know if you have any suggestion.

  73. Shawn
    June 10th, 2019 at 21:34 | #78

    Still available for HOC? interested

  74. interested buyer
    June 12th, 2019 at 12:00 | #79

    Any concern on the Indah Water facility at the turning from highway into N-park?

  75. Tribuyer
    June 18th, 2019 at 20:59 | #80

    Anyone have update on the construction progress? View from highway seem very slow, like not moving..

  76. DT
    June 21st, 2019 at 08:49 | #81

    Can send me the latest package too ?

  77. esgood
    June 21st, 2019 at 15:03 | #82

    @Tribuyer
    They are building Tower A at around one floor per 10 days.
    Right now at 4th floor already.

  78. GS
    June 21st, 2019 at 23:19 | #83

    I am still trying to get in to the WhatsApp group.
    I have sent in my request thru email but to no avail.
    If all else fail, please go to FB and search for Triuni Residences – Residents to join instead. At least this way it is searchable.

  79. Albert
    June 26th, 2019 at 07:20 | #84

    esgood :
    @Tribuyer
    They are building Tower A at around one floor per 10 days.
    Right now at 4th floor already.

    1 floor per 10 days or 10 weeks?

  80. Sara
    July 17th, 2019 at 16:04 | #85

    Hi …Can any1 help to advise how get in touch with Triuni Whats app group…im one of the buyer

    • GS
      July 29th, 2019 at 10:53 | #86

      Hi Sara!
      I have sent an email earlier to them but no reply. Join FB instead, at least new buyers get to search and join the group.

      Search for “Triuni Residences – Residents” in FB if any of you would like to get connected with the rest of the owners.

  81. buyer
    July 29th, 2019 at 11:26 | #87

    it’s good buy project

  82. calvin
    August 8th, 2019 at 17:22 | #88

    @GS
    can’t find in FB too

    • GS
      August 11th, 2019 at 13:51 | #89

      Hi Calvin,

      Search for “ Triuni Residences – Residents ” in FB. It’s there..

  83. Calvin
    August 20th, 2019 at 09:45 | #90

    @GS
    got it, thanks.

  84. ghm88
    October 21st, 2019 at 15:19 | #91

    All our comment about the group email for WhatsApp group had been removed. =.=
    For buyer who still interested to join the WhatsApp group, please leave your email here so we can contact you for further action. Thank you.

  85. S H
    October 23rd, 2019 at 23:54 | #92

    Tower B launching anytime soon ?

  86. ed Low
    October 25th, 2019 at 10:22 | #93

    @ghm88
    hi. future resident here.
    lowwaikeat@gmail.com

  87. Calvin
    November 22nd, 2019 at 12:57 | #94

    Hi, Unit owner here, yoonck@gmail.com

  88. Calvin
    November 22nd, 2019 at 12:58 | #95

    @ghm88

    Please add me, thanks.

  89. Man
    November 25th, 2019 at 11:20 | #96

    Tower B already open for registration!

  90. Concerned Owner
    December 3rd, 2019 at 20:17 | #97

    I was told all 3 towers would be completed separately with the tower a aiming next year, tower b 3 years later and tower c maybe even later.

  91. ysj
    February 20th, 2020 at 09:04 | #98
  92. Ang Paik Imm
    July 17th, 2020 at 10:10 | #99

    Future resident here, pls add me. Thanks
    xue_hoon@yahoo.com

  93. Jensen
    July 21st, 2020 at 16:42 | #100

    Tower A and Tower B is now opening for sale, for Tower C we have not heard from them yet.

  94. T buyer
    July 28th, 2020 at 10:20 | #101

    Hi can add me. To triuni buyer WhatsApp group / fb group

    Dylenloh89@gmail.com

    • Owp
      October 1st, 2020 at 23:04 | #102

      Anyone added you? Please add me too – owp1985@gmail.com

  95. BLT
    September 2nd, 2020 at 15:49 | #103

    I am a potential buyer of tower B. I am looking at high level unit and was told that it is RM756/sf. this price seems still high especially at current economy situation.

    I wonder if the developer able to sell all the units and get the funding to continue the whole project? Any comment?

  96. Laura
    September 11th, 2020 at 22:09 | #104

    @BLT
    Hey man, yes, we can sell. Mainly because their main contractor is Kerjaya Prospek, the quality is what you pay for. You can email me at laurachen92@yahoo.com if you’re interested.

  97. John
    October 1st, 2020 at 23:02 | #105

    Looks like tower A is almost complete and the base can be seen for tower B and C.

  98. Hello
    October 6th, 2020 at 14:53 | #106

    Any buyer for 840sqf at tower B? The location is good, but the layout for 840sqf seems odds.

    • John
      October 11th, 2020 at 08:58 | #107

      Why odd? I think it is just depending on your preferences and budget.

  99. John
    October 14th, 2020 at 15:46 | #108

    This thread needs to be sorted, it is not following sequence from old comments to newest comment

  100. Kate
    October 15th, 2020 at 17:23 | #109

    When tower C will be launched?

  101. John
    November 4th, 2020 at 21:57 | #110

    Any tower B owner here?

  102. Hello
    November 5th, 2020 at 11:36 | #111

    @John, For 840sqf, personally feel that the hallway after entrance is a bit weird and the open kitchen concept together with dining and living area ..(hmm..). 1036sqf layout sound better, but exceed my budget.

  103. Question
    November 24th, 2020 at 13:20 | #112

    This project facing sea?

  104. Hello
    November 24th, 2020 at 16:38 | #113

    @Question

    nope, facing either queensbay or N-park.

  105. JJ
    November 25th, 2020 at 14:42 | #114

    @John
    Here for Block B

  106. Alex Mah
    November 26th, 2020 at 11:11 | #115

    Which Towel can have sea view?

  107. Triunibuyer
    November 29th, 2020 at 11:36 | #116

    I just bought a unit(facing qb/seaview) at tower B with sky garden, bought it just become of the convenient location and also the huge discount which is original rebate + extra 19% due to MCO, and get bank loan rate at only 2.9%(public bank), is that anyone also bought Triuni now?

  108. Want to buy also
    November 30th, 2020 at 00:03 | #117

    @Triunibuyer
    mind to share after discount nett nett RM per sqft is how much?

  109. Triunibuyer
    November 30th, 2020 at 11:58 | #118

    I bought 1076sqft facing seaview is about RM 680persqft after extra discount but the sales person serve me very well, patiently introduce me to some project I want in my budget and requirement, and then let me compare and explained very detail, quite lucky to meet her. @Want to buy also

  110. Hello
    December 2nd, 2020 at 23:07 | #119

    @Triunibuyer
    Block B has the best view but not fully seaview as you mentioned. I am one of the buyers too, like the layout and concept the moment I step into the gallery.

  111. Triunibuyer
    December 4th, 2020 at 15:47 | #120

    owh good to heard that, I bought unit 10, so far satisfied with the view. @Hello

    • James
      December 4th, 2020 at 22:17 | #121

      Unit 10 is 1076 sqft?

  112. KC
    December 8th, 2020 at 17:50 | #122

    Block B Unit 10 has the best view. Good choice!

  113. athaariq
    December 15th, 2020 at 19:28 | #123

    Anybody here for Block B? What is the progress of Block B

  114. Hi
    December 17th, 2020 at 22:33 | #124

    I am one of the block B owners. Now first floor

  115. K
    December 23rd, 2020 at 13:11 | #125

    Hi

    Are there any Tower B WhatsApp groups available now? I am one of the buyer and would appreciate if anyone can add me in, if there are any.

    ong_900@hotmail.com < this is my email address

  116. Hello
    December 25th, 2020 at 09:39 | #126

    @K
    Go to FB group – Triuni Residences buyer. Many buyers are there

  117. Steve
    December 28th, 2020 at 10:07 | #127

    Is this project good for investment?
    Or any surrounding better project to invest? Such as Quaywest, waterfront, Zen6 or other….

  118. Gary
    December 31st, 2020 at 20:47 | #128

    In my opinion, all of the projects stated are good for investment depending on your budget and target group, especially current market where buyer has more power due to overflooding of properties and of course, Covid. Furthermore, new property is entitled to HOC (10% discount and many exemptions). If your finance is good, why not go for it? :)

  119. RAHIM ISMAIL
    January 20th, 2021 at 16:48 | #129

    I AM ONE OF PROPESCT BUYER FOR TOWER B, 840 SQ FT

  120. Fishy
    January 25th, 2021 at 21:58 | #130

    Hi, I’m interested on this project block B – 840sf. Prefer facing South (QB) but left lower floor; and worry North will be block by E park / block C.
    Any Block B North buyer here?

  121. Prospect
    January 27th, 2021 at 22:51 | #131

    I am block B buyer but face South. I think you can arrange a site visit after MCO to get an idea if it is going to be blocked by other apartments

  122. Vic
    February 5th, 2021 at 10:37 | #132

    @Fishy
    I’m the potential buyer for Block B – 840 sqft.
    Understand that the parking will be front and back for 840sqft.

  123. Vic
    February 5th, 2021 at 10:39 | #133

    @Prospect
    Hi, would like to check with you for type F1 all the parking lot will be front and back?

  124. Prospect
    February 6th, 2021 at 10:41 | #134

    @Vic
    No idea, you can check with their sales. I bought type G

  125. K
    February 20th, 2021 at 22:05 | #135

    @Vic

    Only certain units are allocated with side by side parking lot. You have to check with the sales which unit.

  126. Shonk Shiau
    March 1st, 2021 at 15:52 | #136

    Booked Block B 2 months back and i spoken to the Site Engineer from Kerjaya Prospect and apparently KP is only awarded to construct Block A & B. No news on Block C yet. I’m Kinda worried with the development of Block C. Will it only start 2 years after the completion of block B ? Worried about the safety, noise and pollution.

  127. Hao
    April 6th, 2021 at 06:15 | #137

    Hi there,

    Did anyone purchase a bigger unit like 1600sf or 1900sf? Appreciate if you could share info on price per square feet. Thank you. Stay safe!

  128. handsome
    April 20th, 2021 at 09:43 | #138

    Shonk Shiau :
    Booked Block B 2 months back and i spoken to the Site Engineer from Kerjaya Prospect and apparently KP is only awarded to construct Block A & B. No news on Block C yet. I’m Kinda worried with the development of Block C. Will it only start 2 years after the completion of block B ? Worried about the safety, noise and pollution.

    @Shonk Shiau

    really ar?

  129. chn
    May 3rd, 2021 at 03:23 | #139

    @handsome
    same case for sky ville

  130. Megan
    July 31st, 2021 at 20:14 | #140

    Hi there, wondering any buyers concern about the septic tank and mosque?
    I current considering Block B #3A. Need some constructive advice from kind people here. Thanks in advance.

  131. HY
    November 12th, 2021 at 14:31 | #141

    Buyer of tower C here, any group available to join?

    • Xoxo
      November 13th, 2021 at 20:26 | #142

      How’s the package for tower c? Got small unit available?

  132. oooo
    February 15th, 2022 at 23:19 | #143

    @Xoxo
    nope

  133. xoxo
    March 16th, 2022 at 16:00 | #144

    why the selling price is so high??!

  134. TheCookies
    March 17th, 2022 at 02:12 | #145

    xoxo :
    why the selling price is so high??!

    For the rich people only TQ

  135. Linz
    June 16th, 2022 at 15:15 | #146

    Hi Buyer for tower C, please let me know how to join the Whatapps/FB group chat.

    HI Xoxo, the smallest unit for tower c is 1146SF

  136. Chen
    June 20th, 2022 at 08:04 | #147

    Hi

    Are there any Tower A WhatsApp groups available now? I am one of the buyer and would appreciate if anyone can add me in, if there are any.

    kewchenhau@gmail.com < this is my email address. tq

  137. Xoxo
    June 24th, 2022 at 01:06 | #148

    Hi Linz, what’s the package for smallest unit in Tower C

  138. Ruru
    July 17th, 2022 at 20:32 | #149

    Tower C smallest unit is TypeA/A1. 1146 sqft, south and north available but availability gonna be pretty low. Tandem CP.

    Construction has been pretty slow.

  139. bread
    July 28th, 2022 at 15:33 | #150

    @Linz
    I’m also buyer of tower C.. anyways wonder about the progress of the construction

  140. Ruru
    August 19th, 2022 at 18:58 | #151

    August Progress Update
    Tow B: 9 in progress
    Tow C: 1 in progress

  141. 3rd party comment
    August 20th, 2022 at 10:39 | #152

    I wonder what takes so long to complete 3 blocks of tower. Very bad sales or developer no money. This project launched together with my current property I am staying right now for over 5 yrs. Somehow, this project still ongoing. I like Triuni but the progress is like snail.

  142. Ruru
    September 22nd, 2022 at 01:34 | #153

    Sept Progress Update
    Tow B: 10 in progress
    Tow C: 1 in progress

  143. kongkam
    October 18th, 2022 at 18:09 | #154

    anyone who get block C.. any rebate/offer?

  144. Ruru
    October 29th, 2022 at 10:06 | #155

    Happy Deepavali and Halloween :)

    October
    Tow B: 11/12
    Tow C: 1

  145. jack
    October 29th, 2022 at 23:57 | #156

    @Ruru
    One month settle 1-2 floors?

  146. Ruru
    October 31st, 2022 at 10:17 | #157

    @jack

    Yes approximately.

  147. yygg
    November 30th, 2022 at 11:58 | #158

    Hi I’m Buyer for tower C, please let me know how to join the Whatapps group

  148. YC
    June 4th, 2023 at 00:18 | #159

    Hi. I’m one of the buyer. Is there any WhatsApp group available to join? Thanks

  149. QQ
    June 6th, 2023 at 13:13 | #160

    Im buyer for block B, any whatsapp group for owner ?

  150. Ryan
    June 24th, 2023 at 22:56 | #161

    hi can anyone add me into tower c buyer whatsapp group

  151. Ivan
    January 12th, 2024 at 00:36 | #162

    I am the buyer for Block C, is there any owner WhatsApp group I can join? Thank you.

  152. yygg
    January 24th, 2024 at 15:31 | #163

    Would like to know tower A resident buyers , how is the overall property? is the workmanship is awesome? acceptable? or bad? After your defect check, is it consider satisfy?

  153. Mini Coupe
    January 24th, 2024 at 21:36 | #164

    @yygg
    My suggestion is to buy The Pier which better location & guarantee high return & appreciation in capital.
    I bet you 1M bench mark & RM3k above rental for The Pier with seafront.
    Triuni location is bad & those unit facing N park is worsen & last week just happened got Nigeria student carried drug then fell down when he tried to escape from police in unit.

  154. millionaire
    January 25th, 2024 at 23:55 | #165

    This forum is meant for Triuni residence, why suddenly got The Pier salesman intervene in a situation without necessity.

  155. yygg
    January 26th, 2024 at 14:29 | #166

    @Mini Coupe
    I’m buyer for tower C, facing QB. I just want feedback from residents in this condo. Thanks

  156. Mini Coupe
    January 26th, 2024 at 15:39 | #167

    @yygg
    Yes. I’m residence of Triuni tower A. I’m disappointed because of noisy of highway heavy traffic & unfortunately our view already blocked by The Zen/Zen6.
    Currently I already booked The pier which I personally feel is much better than Triuni & Queens waterfront.
    The Pier is a combination from this 2 projects & quality finishing & seafront promenade. The environment much peaceful far from noisy highway & heavy traffic Waterfront. Just my 2cent input.

  157. RuRu
    February 8th, 2024 at 09:54 | #168

    Its so funny when AG sales person comes in and bash blatantly. One should actually go and see the real thing, especially when Tow A is already up. Judge it by yourself.

    Tow C progress is speeding up fast. Im guessing maybe TowC owner might get their keys this year.

  158. janet
    February 8th, 2024 at 11:21 | #169

    @RuRu
    Whether AG sales person or not, I think it is true that it is very noisy from highway traffic. Not only noisy, super dusty too. In order to prevent asthma, at least 500m away from highway is required. For decent healthy living, at least 1km away from highway. None of these projects (Queens, Pier, Zen, Triuni, The Light, Bayswater & vicinity) pass that criteria to be honest.

  159. James Tee
    February 8th, 2024 at 12:27 | #170

    @RuRu
    Obviously Zen6 is much better. Luckily I avoided this project.

  160. millionaire
    February 8th, 2024 at 19:15 | #171

    @James Tee
    In investment world, we go skill and analysis rather than by luck.

  161. James Tee
    February 8th, 2024 at 23:42 | #172

    @millionaire
    Investment 70% analysis 30% by luck.
    You need a little bit of luck to get through too.

  162. James Tee
    February 8th, 2024 at 23:46 | #173

    @janet
    I believe Pier & Zen6 past because little bit far away from highway. Queens failed because of airplane & heavy traffic & same goes for Gurney drive seaside condo. The heavy traffic really unthinkable.

  163. Billionaire
    February 8th, 2024 at 23:53 | #174

    @janet
    All listed are failed except Queens waterfront pass exactly 1km. If you are owner of Queens then you know actual condition & zero highway sound. Triuni is the worst affected among listing. The light city..you may hear the car tyre sound if stand at balcony. You may check it out in actual condition.

  164. Moon
    February 27th, 2024 at 12:09 | #175

    staying tower B, 15 floor and above can hear the high way noise during night?

  165. James bond
    February 27th, 2024 at 12:28 | #176

    @Moon
    Yes. Can hear from balcony but after close window couldn’t hear. No worries. This is luxury condo & developer give good quality of material unlike The Zen or Quaywest.

  166. johnny hates cash
    February 27th, 2024 at 14:42 | #177

    @Moon
    confirm can, you get terrible noise and dust all day long.

Comment pages
1 2 12711
  1. No trackbacks yet.
(You can also Login/Register to submit your comment using unique ID)


Comment Guidelines
  • Avoid political discussion.
  • Comments with inappropriate wordings or personal attack may be moderated or deleted.
  • Developer must register before comment. All anonymous comments claimed to be from developer without registration will be deleted.
  • All advertisement in the comment will be deleted. Please contact us for advertising details.



To advertise your property in this page under "Related Properties for Sale/Rent":
 1. Submit your property at PenangPropertySale.com, it's FREE!
 2. Remember to select "Triuni Residences" as the [Related Project]
 (Please do not advertise your property in the comment)