fbpx

Air Putih residents to benefit from drainage and connectivity upgrades

air-puteh-upgrade1

Residents in the Air Putih constituency can look forward to improved infrastructure with two proposed projects aimed at enhancing drainage, pedestrian safety, and traffic connectivity in the area.

The projects include the upgrading of the drainage system and road shoulder along Jalan Goh Guan Ho, as well as a proposed road connection between Lintang Sempadan and Solok Sempadan. Both initiatives were put forward by Air Putih assemblyman Lim Guan Eng and highlighted during the Chief Minister’s Jelajah Programme in Air Putih.

Chief Minister Chow Kon Yeow said the Jalan Goh Guan Ho upgrading project has been allocated RM500,000 by the Penang Island City Council (MBPP) and is expected to commence in September this year. Construction is estimated to take six months.

According to Chow, the existing drainage and road shoulder infrastructure along Jalan Goh Guan Ho has deteriorated and requires urgent improvements. The project will introduce a storage drainage system designed to retain rainwater from surrounding areas before directing it into Parit Lumba Kuda, helping to improve stormwater management.

air-puteh-upgrade-2

The works will also include upgrading shallow drains into larger box culverts of varying sizes, improving road shoulders, and constructing pedestrian walkways based on universal design principles to enhance accessibility and safety for all users.

Meanwhile, a second proposal involving the extension of Lintang Sempadan to connect with Solok Sempadan is being considered to ease traffic congestion and improve accessibility in the neighbourhood. Currently, Lintang Sempadan is a dead-end road without a proper turning facility for vehicles.

Residents of Taman Boundary Apartment have reportedly requested the connection, citing the need for better access into and out of the residential area. The project would involve land acquisition and the construction of a new connecting road along with supporting infrastructure.

MBPP mayor Datuk A. Rajendran said preliminary discussions with the land office have begun, as the project requires the acquisition of privately owned land. The estimated cost, including land acquisition, is approximately RM4.5 million, although the figure remains subject to further assessment.

If the land acquisition process proceeds smoothly, construction could begin by the middle of next year, with completion expected within nine months to one year.

Together, the two projects are expected to improve mobility, drainage capacity, and overall convenience for residents in the Air Putih area.

telegram-logo2Join our Telegram Channel now to receive instant update on Penang latest projects and property news

ADVERTISEMENT
Tags:
RELATED PROPERTIES FOR SALE/RENT AT
  1. No comments yet.
(You can also Login/Register to submit your comment using unique ID)

COMMENT GUIDELINES

  • Respectful Conduct: All comments must be respectful. Abusive, offensive, misleading or inappropriate language will be removed.
  • Relevance: Political or off-topic comments may be removed.
  • No Spam or Self-Promotion: Comments that are promotional or appear to be spam will be removed. Please refrain from sharing links or contact information in the comment.
  • Moderation: We reserve the right to review, edit, or delete any comments that violate these guidelines.
  • All advertisement in the comment will be removed. Please contact us for advertising opportunities.



To advertise your property in this page under "Related Properties for Sale/Rent":
 1. Submit your property at PenangPropertySale.com, it's FREE!
 (Please do not advertise your property in the comment)