fbpx

First batch of affordable state housing ready soon

Property News/ 2 June 2016 No comments

suria-1The first 520 of the 22,512 affordable housing units planned by the present Penang state government are nearing completion.

State Local Government Committee chairman Chow Kon Yeow said the units were being built under the 6.4ha first phase of a Penang Development Corporation (PDC) project in Bandar Cassia.

The development, which will eventually have a total of 11,800 affordable units over 80.9ha, was 70% completed.

He said they were expected to be completed in a few months, adding that buyers could expect to move in by the middle of next year.

The 520 low medium and medium-cost units are being built over three blocks within 2.6ha in the Suria 1 phase while various facilities would be built on the remaining 3.8ha.

“This is the most advanced in terms of progress of affordable housing projects by the PDC in all five districts in the state,” Chow said when contacted yesterday after a signing ceremony held at the PDC Gallery.

Chief Minister Lim Guan Eng was present at the ceremony to witness the signing of the Sales and Purchase Agreement by 14 Suria 1 buyers.

Lim said Suria 1 comprised 149 low medium-cost units of 800sq ft each priced at RM72,500, 98 Type-B medium cost 900 sq ft units (RM168,000) and 273 Type-A medium cost 1,000 sq ft units (RM220,000).

“The gross development value for Suria 1 is RM86.9mil,” he said in his speech at the signing ceremony.

Lim, who is also PDC chairman, said among the facilities to be developed in Suria 1 were a football field, a basketball court, jogging and cycling tracks, a surau and a food court.

He said a total of 22,512 units would be built in 12 projects in all five districts under the state government’s Affordable Housing programme financed by its RM500mil Affordable Housing Fund.

Also present at the signing ceremony were Chow, Deputy Chief Minister I Datuk Mohd Rashid Hasnon, state exco members Lim Hock Seng and Danny Law, Batu Kawan MP Kasthuri Patto, Jawi assemblyman Soon Lip Chee and PDC general manager Datuk Rosli Jaafar.

* Click here for a full list of affordable housing in Penang *

Source: TheStar.com.my

Tags:

Does Penang Need Another Bridge Now?

* By Bernama *

Despite already having two bridges connecting Penang Island and Seberang Perai, the DAP-led state government is pushing for a third bridge, and now waiting for the federal government’s approval to build it.

The state government’s initial proposal was to build an undersea tunnel linking Gurney Drive and Bagan Ajam on the mainland with three main expressways with an estimated cost of RM6.341 billion.

With the undersea tunnel receiving a lot of ‘not so good’ feedback from the public, Chief Minister Lim Guan Eng then proposed to replace it with a third bridge and challenged the federal government to approve the project as he planned to make it toll-free.

With the population in Penang Island and Seberang Perai at about 1.6 million people, experts questioned the necessity for a third bridge.

A former lecturer in town and regional planning at the School of Housing, Building and Planning, Universiti Sains Malaysia (USM), Associate Professor Dr Hassim Mat said roads on Penang Island were already very congested, especially during peak hours, and that traffic policemen had to be stationed at various locations to ease traffic flow.

He said the third bridge would only bring in more vehicles to Tanjung Tokong, Tanjung Bungah, Batu Ferringhi, Pulau Tikus and Gurney Drive, and thus cause more congestion.

“Why bring more traffic to the already congested roads on Penang Island. A more logical move is to resolve the problems of traffic congestion here first.

“I am not against the (proposed) plan but as of now, I do not think another bridge will help to ease the traffic situation in Penang Island, but it will only worsen traffic congestion on the island as there will be an increase in the number of vehicles on the road,” he told Bernama in an exclusive interview.

Hassim said what Penang needed was a proper urban planning and traffic management system, not a third bridge that would result in more traffic chaos.

Penang’s second bridge, Jambatan Sultan Abdul Halim Mu’adzam Shah (JSAHMS), was opened in 2014 and reported to be under-utilised, recording an average of only 14,300 vehicles daily.

Jambatan Kedua Sdn Bhd (JKSB) acting Managing Director and Chief Operating Officer Mohd Ashari Alias said the target set by the company was a daily average of 25,000 vehicles after five years of operation.

He said the number of vehicles using JSAHMS would be lesser if another bridge was to be built to link Penang.

The proposed construction of a third bridge is believed will also affect the ferry service linking the island and mainland.

Penang Port Sdn Bhd chief operating officer V. Sasedharan said less people were now using the ferry service with the opening of the second Penang bridge.

“The number of ferry passengers will further drop if the third bridge project is allowed to go on,” he added.

Source: Bernama

Tags:

Cable car system for Penang gets the axe

Property News/ 31 May 2016 Comments off

penang-sky-cab-rejectedThe proposed cable car system for Penang, which is part of the ambitious RM27bil Penang Transport Master Plan (PTMP), has been rejected by the Federal Government.

Transport Minister Datuk Seri Liow Tiong Lai said the state government has been informed of the decision.

He said the decision was made as the proposed project would affect the passage of vessels operating at the North Butterworth Container Terminal (NBCT).

“We might consider if the state government is willing to change the alignment, which is also subject to several conditions set by the Marine Department,” Liow told reporters yesterday after attending a briefing by the Penang Port Sdn Bhd (PPSB) at Swettenham Pier.

He said the proposed undersea tunnel project also needed to be looked into as it could affect the seabed or the passageway of the ships plying the northern region route.

“The Federal Government is also interested to know more about the tunnel project but to date, the state government has not provided any details,” said Liow.

It was reported that the proposed cable car system spanning the Penang channel, will cross the Middle Bank to mainland. It was expected to be completed between 2018 and 2019.

Liow also said 14 companies are planning to bring their cruise ships this year into Penang and tourists arrivals here could increase from 221,000 to 238,000.

“Although we lost Star Cruise, we have managed to bring in more such ships, which is good for tourism and the economy,” he said.

On the 3.4ha land dispute between PPSB and the state government, which had been earmarked for expansion at the Swettenham Pier, Liow said it was time the state government stopped playing politics for the sake of the Penang people.

“The 3.4ha land for the expansion of PPSB and the land for the expansion of the Tanjung Marina must be resolved as we cannot continue this indefinitely,” he added.

As for the business development of PPSB’s container traffic, Liow said there should be at least 8% growth of container traffic handled by the port.

“PPSB handled 1.3 million twenty-foot equivalent unit (TEUs) in 2015 and the figure is expected to increase to at least 1.45 million TEUs this year,” he said.

Liow, however, said the bottleneck at the Padang Besar train station, which serves as the inland port to bring in more containers via trains from Thailand, could affect the figure.

“The Federal Government is planning a detailed expansion of the Padang Besar railway station and inland port to bring in containers on train from Thailand to the Penang Port,” he added.

On the oil spill on Friday at the Prai Bulk Terminal, Liow said the Marine Department was working closely with the Department of Environment (DOE) and PPSB to identify the source of the spill and take the necessary action.

Source: TheStar.com.my

Tags:

AFFORDABLE: Seberang Jaya / Excel Focus Properties

Seberang Jaya/ 30 May 2016 19 comments

affordable-excel-focus-seberang-jaya

An upcoming affordable housing development in Penang mainland by Excel Focus Properties Sdn. Bhd. Strategically located within the established township of Seberang Jaya, only about 500 meters away from Butterworth-Kulim Expressway. Neighboring communities include Taman Naluri, Taman Naluri Ria and Taman Janggus Jaya.

The proposed development will offers 2 blocks of 34-storey condominium with 1,017 affordable units.

This project is still pending for approval. Details to be available upon project launch.


READ MORE ABOUT AFFORDABLE HOUSING:

Project Name : (to be confirmed)
Location :
 Seberang Jaya, Penang
Property Type : Affordable housing
Total Units: 1,017
Built-up Area: (to be confirmed)
Indicative Price: Below RM250,000
Developer : Excel Focus Properties Sdn. Bhd.

Location Map:

 

Road widening pro­ject at Jalan Masjid Negeri is on

Property News/ 29 May 2016 2 comments

masjid-negeriThe Penang Is­­land City Council (MBPP) is going ahead with the road widening pro­ject in Jalan Masjid Negeri, requiring 16 trees to be transplanted elsewhere by end of next month.

Its traffic engineer Zainuddin Mohamad Shariff said the contractor assigned to transplant the trees had been asked to file the method of statement before any transplanting could commence.

“The statement will explain the method to be taken when transplanting the trees.

“It will then be reviewed by the Forest Research Institute Malay­sia and the project should start next month,” he said.

MBPP arborist Azizul Fahmi Muhamad said the trees would be relocated to a nearby residential area off Jalan Masjid Negeri.

It was reported that the construction cost for the 1.8km road widening project along Jalan Mas­jid Negeri is RM7.85mil and the land acquisition cost RM11mil.

The project will involve the Jalan Scotland-bound stretch start­­ing from the Lorong Batu Lanchang-Jalan Masjid Negeri junction to the Ja­­­lan Air Itam-Jalan Masjid Negeri junction.

Source: TheStar.com.my

Tags: