fbpx

Four Swettenham Pier warehouses to be redeveloped into waterfront leisure hub by 2030

Property News/ 13 November 2026 Leave a comment

warehouses

Four old warehouses surrounding Swettenham Pier Cruise Terminal (SPCT) in George Town are set to undergo refurbishment and adaptive reuse, transforming them into a waterfront leisure destination featuring duty-free retail outlets, dining facilities, exhibition spaces and art markets, according to a report by Kwong Wah Yit Poh.

Penang State Tourism and Creative Economy Committee chairman Wong Hon Wai said the Penang Port Commission (PPC), through Penang Port Sdn Bhd (PPSB), would undertake the redevelopment of Warehouses 2, 3, 4 and 6. Under the proposed plan, Warehouses 2, 3 and 4 are earmarked for duty-free retail facilities, while Warehouse 6 will be converted into retail space. The wider development will also incorporate food and beverage outlets, exhibition areas, small-scale art markets and event spaces, alongside a pedestrian promenade along the waterfront.

The project aims to preserve the historical and architectural characteristics of the old warehouses, including their maritime heritage, while introducing new uses to the waterfront area. It is also intended to strengthen the connection between the cruise terminal and George Town’s UNESCO World Heritage Site, providing additional retail and leisure options for cruise passengers, domestic tourists and local visitors.

According to Wong, the refurbishment is expected to begin in 2028, with construction taking approximately 18 months and completion targeted for 2030, subject to the fulfilment of preliminary requirements and regulatory approvals. Preparatory work will include site investigations, design development, impact assessments, heritage conservation procedures and procurement. A Conservation Management Plan (CMP) must also be prepared and approved before the conservation works proceed.

The redevelopment will need to accommodate the cruise terminal’s existing passenger operations, particularly during peak arrival periods, to ensure that ground transportation and passenger movement remain functional throughout the construction period.

Separately, Warehouses 5, 7 and 8 at Church Street Pier, together with the land area at Tanjung City Marina, are being considered under a separate development proposal. The Penang Port Commission has issued a request for proposal (RFP) for the sites, based on a proposed 30-year lease with an option for a further 15-year extension. The proposal is currently being followed up and coordinated by the Maritime Division of the Transport Ministry, with its implementation timeline yet to be determined.

telegram-logo2Join our Telegram Channel now to receive instant update on Penang latest projects and property news

ADVERTISEMENT
ADVERTISEMENT
RELATED PROPERTIES FOR SALE/RENT AT
  1. No comments yet.
(You can also Login/Register to submit your comment using unique ID)

COMMENT GUIDELINES

  • Respectful Conduct: All comments must be respectful. Abusive, offensive, misleading or inappropriate language will be removed.
  • Relevance: Political or off-topic comments may be removed.
  • No Spam or Self-Promotion: Comments that are promotional or appear to be spam will be removed. Please refrain from sharing links or contact information in the comment.
  • Moderation: We reserve the right to review, edit, or delete any comments that violate these guidelines.
  • All advertisement in the comment will be removed. Please contact us for advertising opportunities.



To advertise your property in this page under "Related Properties for Sale/Rent":
 1. Submit your property at PenangPropertySale.com, it's FREE!
 (Please do not advertise your property in the comment)