Only one lane open on Penang Bridge for 3 nights starting tomorrow
Motorists using the Penang Bridge should expect possible traffic delays starting tomorrow (24 November) until 26 November, as temporary lane closures will be implemented in both directions to facilitate the installation of an LED advertising board gantry structure.
According to PLUS Malaysia Berhad, the works will take place at KM0.7 of the bridge between 11pm and 5am each night. The middle and right lanes will be temporarily closed, leaving only one lane open to traffic in each direction.
A stop-and-go traffic management system will also be introduced during the installation works to regulate vehicle movements and ensure the safety of motorists and workers at the site.
Motorists travelling between Penang Island and the mainland during the affected hours are advised to plan their journeys ahead and allow additional travel time. They should also reduce their speed when approaching the work area, follow temporary traffic signs and comply with instructions from traffic personnel.
The lane closures are scheduled to end at 5am each morning, with normal traffic arrangements expected to resume outside the designated working hours.


