  1. jocelyn14
    jocelyn14
    November 12, 2015

    @sam
    I want to let go my unit under phase 1. What price are you looking at?

    Reply

  2. sam
    November 15, 2015

    @jocelyn14
    I think 500k should be ok, you agreed?

    Reply

  3. Buyer
    December 5, 2015

    Any idea when completed since launching so long already this project?

    Reply

  4. ps
    December 6, 2015

    @Buyer
    Oriental Max’s project all delay one. You must counted 3 year construction period + 6 month for obtain OC.

    Reply

  5. ping
    December 14, 2015

    really???y om so lousy developer

    Reply

  6. rachel
    January 19, 2016

    Hello this project done soon?

    Reply

  7. JT
    JT
    February 6, 2016

    I love this project. Nice!

    Reply

  8. Max
    February 14, 2016

    JT. Why? Can share your opinion?

    Reply

  9. YSH09
    February 14, 2016

    Visited Orange Garden feel it totally difference. The developer really committed to the project and provided statisfaction to owner. Nice entrance, interlocking, landscap, underground.

    Reply

  10. YSH09
    February 14, 2016

    Maple residence still with small entrance, small pool, tar road, no underground, poor workmanship, no hope of landscape…developer only think of profit only…

    Reply

  11. Max
    February 14, 2016

    Anybody knows phase III still left how many units?

    Reply

  12. ONG
    ONG
    February 15, 2016

    @Max

    About 50 units left

    Reply

  13. ONG
    ONG
    February 15, 2016

    And phase 1 still have 2 units

    Reply

  14. ONG
    ONG
    February 15, 2016

    @jocelyn14
    how much that you would like to sell?
    I am interested.

    Reply

  15. ping
    February 15, 2016

    how much now selling???

    Reply

  16. ONG
    ONG
    February 16, 2016
  17. Max
    February 16, 2016

    Orange garden only left 6 units only..no doubt it is a bit expensive but worth it with the facilities given…

    Reply

  18. Max
    February 16, 2016

    Hope oriental max will do something to this project to attract more purchaser…

    Reply

  19. ps
    February 16, 2016

    @ONG
    Nobody want to buy the balance units lah, so lousy location.

    Reply

  20. ps
    February 16, 2016

    too close to ‘big onions’ & grave.

    Reply

  21. ONG
    ONG
    February 16, 2016

    @ps
    yes, you get free alarm clock every day :)

    Reply

  22. ONG
    ONG
    February 16, 2016

    @owner
    is there any black and white mentioned underground cable at phase 3? or they just verbally promise?

    Reply

  23. ONG
    ONG
    February 17, 2016

    the information that I got is even phase 3 cable is not underground.

    Reply

  24. Max
    February 17, 2016

    Pity this oriental max…if they plan their project properly Iam sure they won’t face these situations that still left so many units….previous year people will sapu all the projects done by OM.

    Reply

  25. Max
    February 17, 2016

    OM, don’t simply built your project…5/600k not easy to earn. For most people may be they will buy once in their life time only…so please lah make your project worth to buy…

    Reply

  26. YSH09
    February 17, 2016

    @max
    I think this happened because of the people in charge is a girl…sorry to say that normally girl are very calculative..they will try to calculate even single cent to get more profit…that is why at last this project comes out ..n so many complaints…

    Reply

  27. Max
    February 17, 2016

    @ONG
    I think phase III have underground cable..I saw it…but phase I and II don’t have…it looks very weird..n ugly…
    @YSH09
    I agreed with u…the director is a girl..my first house bought from OM..but that time their” name” still good…

    Reply

  28. ONG
    ONG
    February 18, 2016

    @Max
    The underground cable that you see is only from the tnb pole to the house.
    So there are still tnb pole and lamp pole with cable that connect from the power source to each house. I think actually that will not make much different from the outlook.

    This is the info confirmed by their senior staff.

    Reply

  29. owner
    February 18, 2016

    the lamp & electric pole already on site, no way to do argument already, what we want to do now is check the work done by OM. Please go to your own unit & knock on the plaster wall, you will found many place the plastering is hollow inside, we need to asked OM to redo this fail portion, if not this hollow portion wiill be crack & fall down one day in future.

    Reply

  30. JT
    JT
    February 21, 2016

    @Max

    Mainly nice nice and strategic location. Besides gated with swimming pool, gym, barbecue area, playground, community hall.

    In long term (8-9 years), the undersea tunnel will connect to BORR. We will just need 10 minutes to go Gurney.

    Price now is RM628 only for NEW 3 storey gated is very cheap for this location. You cant find else where.

    Price will be increased tremendously once undersea tunnel construction started …. unless Penang Government /LGE keep empty promises.

    LGE is also Bagan MP, it is his duty to ensure it works and develop Bagan prosperously.

    Reply

  31. fde
    February 21, 2016

    anybody knows whats the price now?

    Reply

  32. ONG
    ONG
    February 22, 2016

    @fde
    628k

    Reply

  33. Buyer
    February 22, 2016

    Anybody heard about the rumors where it is found something underground (bad for fengshui) at the Maple Residence site during construction? This is just rumors, not verified one.

    Reply

  34. ONG
    ONG
    February 23, 2016

    @JT
    Everybody hope that the undersea tunnel project will proceed soon. However, the reality is, State Government unable to do that (even got money) without consent from federal Government.

    If the developer can manage the serviced residence well (club house facility, greenery, security), I think even without existence of undersea tunnel. Better, if they can get a good tenant (like McD) to get in the standalone shop lot. I think management of the residence will affect the price of this property in the near future.

    Reply

  35. ping
    February 23, 2016

    so when wil ccc obtain?

    Reply

  36. Owner
    February 29, 2016

    anyone interested in Maple residence 1? good house number for sale

    Reply

  37. ONG
    ONG
    March 1, 2016

    @Owner
    can tell more detail including price? I am interested.

    Reply

  38. Owner
    March 1, 2016

    @ONG
    hi whats your phone number? i will sms you

    Reply

  39. ONG
    ONG
    March 1, 2016

    @Owner
    +65 85021892

    Reply

  40. Max
    March 13, 2016

    Anyone have info regarding the dry pond near swimming pool? Is there any design for the dry pond like d link 2.. or OM just leave it like that? It will spoil the whole concept of GnG if OM didn’t beautify it…

    Reply

  41. The Apple
    March 14, 2016

    @Max
    The only way to hope Oriental Max do more design on the pond is you hope their 3rd phase house cannot sell out. Then they will done the pond design properly.

    Reply

  42. ping
    March 15, 2016

    hi any others owners here? when u guys snp due date???my snp due date soon but developer havent done their project, phase 1 owner here.

    Reply

  43. Max
    March 15, 2016

    Then OM should pay u 10% per annum right?
    My snp is on nov 2014 phase 2…

    Reply

  44. The Apple
    March 15, 2016

    My S&P due date is early of May 2016. When i sign snp, i had asked the lawyer’s staff & she told me that got total more than 90 owner sign together with me. If work can’t complete in May 2016, penalty to Oriental Max per month (10% per annual) should be a big figure.

    Reply

  45. Khalid
    March 16, 2016

    @The Apple

    Wow! Durian runtuh!

    Reply

  46. owner
    March 16, 2016

    This developer very kan one. They will get CCC & hand over the house to purchaser in May without approval from TNB & PBA. The whole skim will be no electric & water supplies. This happen in previous project done by them like Carnation & Centralway.

    Reply

  47. owner
    March 16, 2016

    The house key will delivery on time & they wouldn’t let you to claim one cent from them also.
    This happen to me before because i also Carnation’s purchaser. They will insist house owner start to paid the maintenance fee in May although without water & electric supplies.

    Reply

  48. owner
    March 16, 2016

    Oriental Max can get CCC easily because CCC is approval letter from Architect & architect & lawyer is appointed by OM. Oriental Max say one they cannot say two. If not OM will not paid the professional fee to them. Then this 3 gang will join together to cheat the purchaser.

    Reply

  49. Max
    March 16, 2016

    If like that can we bring this matter to tribunal tuntutan pengguna?

    Reply

  50. Max
    March 16, 2016

    If om have their gang, we purchaser should have to unite…n make our own gang..

    Reply

  51. Max
    March 16, 2016

    @ owner
    At last did u successful claim from OM for the carnation villa?

    Reply

  52. ping
    March 16, 2016

    When i sign up snp is in 2013 july, due date shud be at july, but at tat time i hear the staff said only 30 puchaser had sign their snp

    Reply

  53. The Apple
    March 19, 2016

    I call Oriental max asked them about CCC & their staff Miss Carol promise to get CCC by around April 2016.

    Reply

  54. ping
    March 20, 2016

    They simply cheating u i thk.. U go to the site and see, wont be so fast i think.

    Reply

  55. Lol
    March 20, 2016

    Yes developer can gt ccc on April and gt the key, so that wont delay and compesaction any 1 cent to owner, but TNB and PBA no rdy yet, and facilities no rdy yet, u gt key also useless because no electric cant reno, this is oreintal shit stlye.

    Reply

  56. The Apple
    March 20, 2016

    @ping
    We cannot do anything, let wait & see.

    Reply

  57. ping
    March 20, 2016

    If really is like that, this is the last time i bought house from om, will never buy from om again, lousy developer.

    Reply

  58. Max
    March 20, 2016

    Phase III still left 49 units..this is great…I think people scared to buy house from OM since so many complaints from the buyers, so many projects delay n the workmanship like a shit..pls go to carnation villa n see the wall…hope this won’t happen to maple residence….

    Reply

  59. Max
    March 20, 2016

    @ping
    I agreed with u..let’s make OM a lesson..won’t buy from this lousy developer….he can’t go far…not only we complained but all the buyer from different projects …

    Reply

  60. The Apple
    March 20, 2016

    @Max
    You can go inside Carnation Villa? Which wall you mean? fence wall or building’s wall?

    Reply

  61. ping
    March 21, 2016

    u go see maple residence, wall oso not balance ==

    Reply

  62. Max
    March 21, 2016

    @The Apple
    Fence wall…that wall u no need go inside to see…just behind the shop lot…if u go inside…first roll Terrance house u will notify the fence also slanting…especially after they pasang the gate…
    Is it the new design from OM? Ha ha..

    Reply

  63. owner
    March 21, 2016

    That type of crack line is normal for Omax’s project, if you go to their Tambun bunglo project (Orchard Villa). You will surprise with the crack line for their bunglo.Each crack easier more than 10mm & sun light can go direct inside houses. This happen since construction work until now still can’t solve by them.

    Reply

  64. Phase I owner
    March 24, 2016

    OMG…the tar road is higher that house level, the building wall is not even at all…why OM built so lousy house…super disappointed!!!!

    Reply

  65. Ysh09
    March 24, 2016

    observed the tar road between phase 1 & 3 have protruding under ground drain square cover which dangerous for driving, actually this can be avoid, if have well supervision by OM… No strict and professional supervision project..

    Reply

  66. ping
    March 25, 2016

    om project, they cincai cincai do for u only then they earn many n go for next project liao, this project take so long to completed, almost 3 year but the quality oso like this , really dissapointed with this developer, will ask my friend not to buy house from this developer.

    Reply

  67. Ysh09
    March 26, 2016

    Eco meadow launching 375 unit by end of 2014…now only left 20 unit…and they still having the show unit to advertise/promote their sales..price fr 758k onward and still ppl buying.. Why? Because it meet buyer’s need…n they committed to their projects…they did their GnG projects properly and well focus on the greeneries…ppl sapu all the units because they desire a closer distance to appreciate nature, Eco world did well in the landscaping to attract buyers…OM LOOSE because he unable to understand buyers need n no well landscaping. These can be proof fr the response of maple residence which launched in 2012 with 297 units? After three yrs still left 49 units…anyone want to sapu?

    Reply

  68. Max
    March 26, 2016

    OM how to compete with Eco World? Eco world’s marketing strategy is good..the dare to invest to attract purchaser before earning profits…everyone seems very confidence with these giant company. OM ? He still far behind and getting worst…if no changes apply, he will out from these field since everyone will not buying his projects…

    Reply

  69. fde
    March 27, 2016

    I got a project from OM. honestly speaking, om quality is not fantastic but is not considered bad. Every project upon completion sure got issues and are not perfect. I have seen much worse.

    OM generally priced their project well. I always believe u pay peanuts u get monkey.

    I got another project from airmas at butterworth too. That one…pay a premium still get monkey. Pay premium quality really bad. lolz

    Om cannot be compared to the big players like ecoworld. its not apple to apple comparison. Big players like ecoworld do lotsa marketing and naturally comes with a premium. So definitely comes with slightly better quality.

    OM is just a very small developer mainly in butterworth side with only 1 project in island currently. very small player.

    If there are issues with your property, complaining doesnt help. Exercise your rights and demand om to rectify your defects. if no actions taken, exercise ur purchaser rights and demand lawyers to take actions for u.

    All primary properties purchases upon completion are not perfect and comes with defects. it just a nature of this business. Singapore new properties same too.

    Reply

  70. ysh09
    March 27, 2016

    Satisfaction from customer is priority…G&G project must strongly compliance with the good management team, proper guardhouse, landscape, greeneries…it doesn’t mean that putting on the pagar will be a G&G, it need full commitment no matter big or small developer. If today maple residence is not a G&G project, buyer will not require high demand of landscaping n greeneries as well.

    Reply

  71. fde
    March 27, 2016

    satisfaction comes from expectations. What is important is to manage one expectation and that developer comply and adhere to what was initial agreed upon.

    I do agree with you resident committee plays an important role as well as managing agent. If there are really lotsa of issues with common areas, it is best to form the residents committee earliest possible to take control and wack the managing agent to work for you.

    Reply

  72. ysh09
    March 27, 2016

    Owner expectation is to have comfort dream home. Initial agreement is based on the trust, not much reference but much depending on the brochure impression to make decision. Good develop will follow whatever printing in brochure to make it happen.

    Reply

  73. Miss T
    March 30, 2016

    Hi all purchaser, i am from OMax, Actually all the construction work for phase 1 already completed, the drainage & road work they do now is for phase 2 already. All the work on front part like guard house, entrance, club house, swimming pool, shophouse is under phase 2 work. You all not need to worry, we will try asap to get the CCC in April.

    Reply

  74. Wah
    March 30, 2016

    Wah like this also can? Pay maintenace fee but no any facilities and still under construction alt of dust, dare u ask us go stay? We need ur company to compesaction for delay damn

    Reply

  75. ping
    March 31, 2016

    phase 2 road not yet completed, how we go in our house??no need pass thru guard house??are u kidding with us??

    Reply

  76. Miss T
    March 31, 2016

    Sorry, doing some correction, phase one owner must go in & out from Jalan Selayang Permai at the back. The temporary exit point already ready with small guard house & opening. House owner cannot use front entrance to exit until CCC for phase 2 obtain.

    Reply

  77. Goh
    March 31, 2016

    That type of room also call guard house? More like dog house lah. Just use some old metal cladding cover up only. Really spoil the out look of our new house. Maci bye Oriental Max.

    Reply

  78. BuyerAlso
    March 31, 2016

    Who care EW kah, OM kah. Short-changed buyers, delay, delay, defectivity, CCC, water n electricity connectivity issues, etc, etc if cannot settle, will go to Housebuyers Tribunal. Now, Housebuyers Tribunal will accept brochures as the documents evidence also as developer’s promise or mis-leading advertisement. The fight is on soon.

    Reply

  79. Ping
    March 31, 2016

    If om not focus on build phase 3, i thk phase 1 and 2 early can be done,they greedy wanna build phase 3 together

    Reply

  80. SYA
    March 31, 2016

    @Miss T

    What?! OM tried to obtain the CCC without the full facilities and ask the owner starting to pay for the maintenance fee?

    This project was taken 3 years time, but now OM tried to obtain the CCC with this kinds of condition? I visited the site and the construction work for Phase 1 actually done since one year ago. I thought we are waiting for Phase 2 to be done before obtained the CCC. However, I am totally piss off when heard the news that Phase 1 is going to obtain the CCC with a temporary entrance and the so-called “small guard house”? Even without the facilities? You are totally kidding me.

    This is really greedy developer. OM allocate their manpower to focus on Phase 3, and slower down the progress for Phase 1 & Phase 2. And now you tell us you will obtain the CCC with this kinds of condition?

    Why we cannot use the main entrance to enter? U don’t tell me the main entrance also under Phase 2 work??? We bought a gated house without the main entrance and we have to use the temporary lousy entrance at behind? This is totally ridiculous!! If OM want us to use the entrance at behind, please do a nice entrance for us with a nice guard house, but not the one like dog house. How I am going to stay inside? And I telling people I go in my house from behind gate?

    Please feedback to your management. We need the satisfy answer and explanation from OM.

    Reply

  81. Ping
    March 31, 2016

    I think all owner must form a group in fb or wechat whatsapp to discuss and complain with om

    Reply

  82. Goh
    March 31, 2016

    I very sure that at the time i book my unit, their sales manager Jenny promise me that all facility will hand over together with our house, must go to ask lawyer how to settle this.

    Reply

  83. Goh
    March 31, 2016

    This rule cell Oriental Max try to rush the phase 3 house because `tak laku`, they treat phase 1 & 2 buyer as innorant people because we already in their hand.

    Reply

  84. The Apple
    March 31, 2016

    @Ping
    I think the best way is choose one day we met on site & join together go to Oriental Max office to verify with them.

    Reply

  85. ping
    March 31, 2016

    @The Apple
    need to ask all of the puchaser, if not just a few ppl they wont entertain u.

    Reply

  86. Ping
    April 2, 2016

    Delay deliver house from us get 10% per annum, u guys hope om delay us 2-3 month n pay us few thousand use..hahaha

    Reply

  87. JT
    JT
    April 2, 2016

    Any chatroom for buyers? I would like to join.

    Reply

  88. ysh09
    April 4, 2016

    These show that OM is cheating the buyers…

    Reply

  89. Phase I owner
    April 5, 2016

    Please help to form a group for all maple owner for discussion on this issue, we must fight for our right!!!!!

    Reply

  90. The Apple
    April 5, 2016

    As I know, IWK sewer plant also in phase 2 area, that mean phase 1 owner also cannot use this IWK sewer treatment plant after CCC obtain? So where this shit discharge to?

    Reply

  91. Hello
    April 5, 2016

    @The Apple
    OM rush for OC without facilities and guard house is totally not acceptable. If OC without sewerage treatment plant, definitely I will kill them!!! What is all this bull shit lousy OM!!
    RIP to phase 2 and phase 3 owner. Cannot imagine what house quality they can have…finger cross phase 1 quality can be sui sui =(

    Reply

  92. Ping
    April 5, 2016

    Let discuss how we form a group first,any1 have ideas? Leave a hp number or fb account here??

    Reply

  93. Maple Owner
    April 5, 2016

    Since we have OMax representative here, and i believe you should see all the owner commnet that we coundn’t accept the “solution” given by OMax. We as owner, we want OMax give us a reasonable solution, else we will fight until the end, including report to suruhanjaya anti rasuah for how OMax get CCC. I believe now land/house issue is a hot topic now for Penang, please dont force us to make this issue until that situation…

    Reply

  94. ping
    April 6, 2016

    who know maple residence butterworth facebook pages is creating by who??mayb we can find many others owners through that pages.

    Reply

  95. Zzz
    April 6, 2016

    We just chat here, let ppl ban this oreintal shit project, most lousy developer in pg.

    Reply

  96. The Apple
    April 7, 2016

    Miss T should let us know still got CCTV or not for phase 1. Normally CCTV is control in Guard House, since the guard house not yet ready that mean phase 1 also without CCTV control. Right?

    Reply

  97. MR1 Owner
    April 7, 2016

    i googled somewhere. it said now no longer need OC, all new project is able to stay once the CCC is obtained. in order to have CCC, the property must have confirmation of water, electric etc etc.. or else the architect is waiting to be sued. correct me if im wrong.

    and it is legal if we get the house key without facilities, just we no need to pay maintenance fees. i got this from my lawyer friend.

    http://property-market.blogspot.my/2007/09/understanding-new-ccc.html

    Reply

  98. ysh09
    April 7, 2016

    @The Apple
    I don’t think this lousy OM will provide CCTV…all the OM projects dun hv CCTV one..

    Reply

  99. Owner =((
    April 7, 2016

    I’m one of unlucky owner in phase 1.
    Really feel speechless and disappointed til MAX to OM this worst developer.
    We should create a community to discuss further about this issue.
    Maybe can leave contact or any information so that we can contact each other.

    Reply

  100. Owner =((
    April 7, 2016

    @ping
    I saw the page in FB oso.
    Maybe we can go contact each other and gather more owner in mapel resident through the page.

    Reply

  101. The Apple
    April 8, 2016

    @ysh09 CCTV is include in S&P document. If they don’t want to provide, really like robber.

    Reply

  102. ping
    April 8, 2016

    I thk we shud do a whatsapp group for easy to contact n c8 group discuss, i left my hp here 0174070816,if u is owner pls whatsapp me n i c8 a group to add u all in,ok?

    Reply

  103. ping4ever
    ping4ever
    April 8, 2016

    i add u all in whatsapp group, my hp 017-4070816 , if u owners pls whatsapp me

    Reply

  104. JT
    JT
    April 8, 2016

    Called up OM.

    Handing over Maple Residence

    Phase 1 – May 2016
    Phase 2 – Nov 2016
    Phase 3 – Next year

    Reply

  105. ping
    April 8, 2016

    @Owner =((

    @The Apple

    @MR1 Owner
    Msg me i add u all in group

    Reply

  106. Owner =((
    April 9, 2016

    @ping

    I did message u yesterday, but you not reply..

    Reply

  107. ping
    April 9, 2016

    When?

    Reply

  108. m1 owner
    April 13, 2016

    @JT
    Are u sure that they can deliver house on may??

    Reply

  109. JT
    JT
    April 14, 2016

    @m1 owner
    This was what being told by OM office. Please call and verify again.

    Reply

  110. m1 owner
    April 14, 2016

    visited site today but seem like this project still have to take long time to completed, at least half year.

    Reply

  111. Think
    April 15, 2016

    That is the problem, don’t you see it.
    The victim house buyers will eventually form WhatApps or FB grp and discuss the problems privately by a few ppl, no more in public forum.
    So, developer will be happy, no worry, no pressure to correct or improve because not many ppl knows how lousy, how bad they are. So, they continue to cheat new buyers lo. ha, ha, ha.

    Reply

  112. Think
    April 15, 2016

    Good example :-

    OV1 buyers really really discussed and hammered the developer badly in the public forum until so many ppl knew about it, affected their sales and reputation.
    So, when they came out with OV2, they are more humble, cautious, better price, better quality and more listen to customers lo. Now you see why.

    Reply

  113. Think
    April 15, 2016

    Add on :

    They also correct the problems and complaints by OV1 buyers after the handling over of keys. They also scare their public reputation and future projects sales affected ma.

    The moment buyers decided to form FB or WhatApps group, discuss privately, developers are relief and happy already.

    Reply

  114. Zzz
    April 15, 2016

    So we should shut here, fxxk u oreintal shit, just know build shot house shit project waste the land.

    Reply

  115. ysh09
    April 26, 2016

    What happen to the back of phase one first row? Why till now no fencing wall but appeared many car parks at the back of the row??

    Reply

  116. kk
    April 27, 2016

    call n ask om staff see what happen

    Reply

  117. Hello
    April 28, 2016

    Phase 1 in-house workmanship like shit, wall crack still repairable but it’s uneven like wave! Really disappointed to this lousy developer ;(
    Putting no hope they can handover house to us at May…
    Nothing we can do but much sympathy to those 2nd &3rd phase owner with 6/7xxK vs my time 4xxK…

    Reply

  118. ysh09
    April 28, 2016

    @Hello
    Yes….really no worth to buy if the quality like shit….those who still consider this phase 3 project must really open your eyes…

    Reply

  119. buyer
    May 1, 2016

    This developer dnt even know how to built a road… suck workmanship and rude stuff. Regret buying this project.

    Reply

  120. kk
    May 26, 2016

    already end of may, snp due date, but i havent received any letter to get my new house key

    Reply

  121. Hello
    May 26, 2016

    kk :already end of may, snp due date, but i havent received any letter to get my new house key

    Anybody know what is the site progress now? Is the dog house guard house still there? I stay at penang island and seldom go to site now.. They promised CCC at May but now is end of May still no letter no call from them, called to office but keep on ask me wait, what the hell..can’t wait to get keys complaint their workmanship, anybody know when can get key? I really learn the lesson to deal with mainland developer now, suck.

    Reply

  122. MR1 Owner
    May 30, 2016

    Hi. may i know what is the process or steps to be taken to renovate our gate? the current 1 is too small..

    Reply

  123. kk
    May 30, 2016

    Hi all purchaser , have u guys received letter from om for key delivery?

    Reply

  124. ysh09
    May 30, 2016

    Anybody know phase 3 still left how many units?

    Reply

  125. JT
    May 31, 2016

    @kk

    Yes, I’ve received the letter on yesterday, too.

    I went to the site, don’t think the site is safety enough to stay. They even have yet to put any partition between phase 1 with phase 2 and 3. How can the CCC able to obtain with such condition? I have called up OM previously, and asking whether they will do any partition to cover, the PIC Chris told me, they are not planning to do so yet, because it may caused the workers inconvenience to do the construction. I requested him to feedback to management. We have paid money to purchase the house, and OM should consider the solution to solve the problem, but not only think of their own advantages and benefit. Otherwise, s it we are going to stay together with the Foreigner workers in construction?

    Reply

  126. Angry bird
    June 7, 2016

    Received the delivery of vacant possession letter and collected the key this afternoon. What a heart attack if you go to see the quality of the house. Tiles in the kitchen and the toilet are missing.. Flooring with paint, dust & rubbish, used toilet bowl.. Worst is the crack line downstairs.. Wonder how MPSP approved the CCC ? The house is not ready at all..

    Reply

  127. Med
    June 24, 2016

    Anyone wish to let go the unit below 600k?

    Reply

  128. jacklim
    July 18, 2016

    For sales phase 2

    Reply

  129. Tan
    October 10, 2016

    Anyone wish to let go their unit below 550k? serious buyer.

    Reply

  130. CB Chris
    October 13, 2016

    I’m phase 2 customer. I bought a unit there.

    received call from CB Chris from OM said that required certain info and the way he call to customer in appropriate and threatening customer said if not provide earlier, delay in OC obtain will bear by customer. WTF to him!

    I commented here to let’s all align that we all facing same issue?
    Another question to OM, is it phase 2 OC obtained? When can we get the key and how much balance need pay for sinking fund and etc..

    I will make a call to legal firm to ask on the status

    Reply

  131. haha
    October 13, 2016

    @CB Chris

    I called to OM legal firm and OC phase 2 already obtained 10-Oct. Soon, all will get notice.
    I had received call also, he was so rule and LCLY

    Reply

  132. The Apple
    October 14, 2016

    Anyone wish to let go their unit below 560k?

    Reply

  133. P.P.
    October 30, 2016

    Hi all, May I know whether the swimming pool is ready with water? And gym room ready?

    As Ccc obtained and need to start paying maintenance. Is the facility ready yet?

    Reply

  134. Poh
    November 23, 2016

    Dear all,

    Got any phase 2 owner? Me is one of Phase 2 owner. I plan do one group in watapps, got any problem we can gather all the problem then sumbit to developer.

    Reply

  135. Poh
    November 24, 2016

    @CB Chris

    Hello, you is phase 2 owner? Ur house got facing many problem?

    Reply

  136. Poh
    November 24, 2016

    haha :
    @CB Chris
    I called to OM legal firm and OC phase 2 already obtained 10-Oct. Soon, all will get notice.
    I had received call also, he was so rule and LCLY

    Hello, you is phase 2 owner? Ur house got facing many problem?

    Reply

  137. haha
    December 7, 2016

    @Poh
    Yes, We can have a watapps group to share each others defect complaint issue. And, how developer react.

    Reply

  138. Poh
    December 15, 2016

    @haha

    Good. My phone number is 0125595124, can you add me? Or u wan me add you?

    Reply

  139. Freshwater Bay
    December 22, 2016

    Did anyone in Maple residence see the Beechcraft plane that crashed around 500 meters away at the south end of the TUDM runway yesterday? Trying to find out which direction it came from, normally all the planes come in from Raja Uda and they are very low over the Maple residence area. Someone said the plane came in near Pantai Robina, which is not usual.

    Reply

  140. ju
    January 29, 2017

    hi i would like to let go my unit
    please watapps me +6598804728
    thanks

    Reply

  141. MapleViewer
    February 8, 2017

    Visited the phase 3 show house. One word : Terrible. Impossible to park two sedan car at the car pouch. When enter the living room, saw a water sewage pipe covered with the “Square” plaster ceiling, and it is leaking …and super cut cost design for sewage pipe routing, really speechless, its a show house. Don’t understand the developer mindset, why would a developer show a “lousy” show house to customer. Well, at least i think the developer is going to be honest to the buyer on how bad the house quality is. Please go and have a visit yourself and verify my statement, after all is my own opinion after viewing the show house.

    Reply

  142. TC
    April 5, 2017

    @haha

    Please add my phone in group as well 0125788631

    Reply

  143. eddy
    September 26, 2017

    planning to buy for own stay. any1 wanna let go their units? whatsapp 0175000191

    Reply

  144. Classical
    December 10, 2018

    I am Interested serious buyer, owner can contact directly to classical_power@yahoo.com
    agent don’t contact please. Maple Residence Owner only please. Thank you

    Reply

  145. CY
    February 16, 2019

    I am Interested serious buyer, owner can contact directly to 011-10707728

    Reply

  146. Load More Comments…

Leave a Reply

Your email address will not be published. Required fields are marked *

COMMENT GUIDELINES

  • Respectful Conduct: All comments must be respectful. Abusive, offensive, misleading or inappropriate language will be removed.
  • Relevance: Political or off-topic comments may be removed.
  • No Spam or Self-Promotion: Comments that are promotional or appear to be spam will be removed. Please refrain from sharing links or contact information in the comment.
  • Moderation: We reserve the right to review, edit, or delete any comments that violate these guidelines.
  • All advertisement in the comment will be removed. Please contact us for advertising opportunities.

Back to top


99+